My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-88 March 26, 2025 <br /> <br /> 1 <br />CNH 8-23.DOCX 2 <br />8-23 TEMPORARY PAVEMENT MARKINGS 3 <br /> 4 <br />8-23.1 Description 5 <br /> 6 <br />Section 8-23.1 is supplemented with the following: 7 <br /> 8 <br />(******) 9 <br />The Work included in this Section shall include all temporary pavement markings used 10 <br />on the project. This shall include all temporary pavement markings applied to milled 11 <br />surfaces that will be exposed to traffic and all new pavement lifts that will be exposed to 12 <br />traffic. 13 <br /> 14 <br />8-23.2 Materials 15 <br /> 16 <br />Section 8-23.2 is supplemented to read as follows: 17 <br /> 18 <br />(******) 19 <br />Materials for temporary markings shall be paint or reflectorized aluminum tape, as 20 <br />directed by the Engineer and selected from approved materials listed in the Qualified 21 <br />Products List. 22 <br /> 23 <br />Temporary paint shall be used on subsurface pavements and may be paved over. Should 24 <br />sudden inclement weather create a pavement too wet to install temporary paint, 25 <br />temporary flexible raised pavement markers shall be installed on 40’ intervals as directed 26 <br />by the Engineer. Temporary flexible raised pavement markers shall be selected from 27 <br />approved materials listed in the Qualified Products List. Temporary flexible raised 28 <br />pavement markers shall be nailed to the subsurface pavement and removed prior to 29 <br />paving. Reflectorized aluminum tape shall be used on new pavement and removed 30 <br />during permanent marking application 31 <br /> 32 <br />8-23.5 Payment 33 <br /> 34 <br />Section 8-23.5 is supplemented read as follows: 35 <br /> 36 <br />(******) 37 <br />Temporary Pavement Marking will be paid for under bid item “Temporary Pavement 38 <br />Markings” per linear foot. This shall be full pay for constructing, maintaining, and 39 <br />removing temporary lines and markers as specified. No additional compensation will be 40 <br />allowed when Contractor is required to repair temporary markings that have been 41 <br />damaged or worn. 42 <br /> 43 <br />GKK 8-26.DOCX 44 <br />8-26 RESOLVE ABOVE GROUND CONFLICTS 45 <br />(******) 46 <br /> 47 <br />Section 8-26 is vacant and is replaced with the following: 48 <br /> 49
The URL can be used to link to this page
Your browser does not support the video tag.