Laserfiche WebLink
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-89 March 26, 2025 <br /> <br />8-26.1 Description 1 <br /> 2 <br />This work consists of resolving unanticipated above ground conflicts to conform to the 3 <br />Project requirements due to construction, where they are not addressed by the 4 <br />Construction Plans and Details. This bid item may be used to construct or modify items 5 <br />which are not identified, nor addressed in the Plans and Details. 6 <br /> 7 <br />8-26.2 Vacant 8 <br /> 9 <br />8-26.3 Construction Requirements 10 <br /> 11 <br />As directed by Engineer, address and resolve underground conflicts that need 12 <br />modification to accommodate construction. 13 <br /> 14 <br />8-26.4 Vacant 15 <br /> 16 <br />8-26.5 Payment 17 <br /> 18 <br />“Resolved unanticipated conflicts” Force Account, as provided in Section 1-09.6. 19 <br /> 20 <br />To provide a common Proposal for all Bidders, the Contracting Agency has entered an 21 <br />amount in the Proposal to become a part of the Contractor’s total Bid. 22 <br /> 23 <br /> 24 <br />END DIVISION8.RTF 25 <br /> 26 <br />END DIVISION 8 27 <br /> 28