My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Benefit Code Key – Effective 3/5/2025 thru 8/30/2025 <br />16 | Page <br /> <br />Note Codes Continued <br /> <br /> X. Workers on hazmat projects receive additional hourly premiums as follows - Class A Suit: $2.00, Class B Suit: <br />$1.50, Class C Suit: $1.00, and Class D Suit: $0.50. Special Shift Premium: Basic hourly rate plus $2.00 per hour. <br /> <br />When due to conditions beyond the control of the Employer or when an owner (not acting as the contractor), a <br />government agency or the contract specifications requires that work can only be performed outside the normal 5 am <br />to 6pm shift, then the special shift premium will be applied to the basic hourly rate. When an employee works on a <br />special shift, they shall be paid a special shift premium for each hour worked unless they are in OT or Double-time <br />status. (For example, the special shift premium does not waive the overtime requirements for work performed on <br />Saturday or Sunday.) <br /> Y. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work <br />(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. <br /> <br />Swinging Stage/Boatswains Chair: Employees working on a swinging state or boatswains chair or under conditions <br />that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above <br />the classification rate. <br /> Z. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. <br />Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the <br />Employer or when an owner (not acting as a contractor), a government agency or the contract specifications require <br />that more than (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the <br />special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a <br />special shift, they will be paid a special shift premium for each hour worked unless they are in overtime or double- <br />time status. (For example, the special shift premium does not waive the overtime requirements for work performed <br />on Saturday or Sunday.) <br /> <br /> <br /> <br />Note Codes Continued <br /> <br />9. A. Workers working with supplied air on hazmat projects receive an additional $1.00 per hour. <br /> <br />Special Shift Premium: Basic hourly rate plus $2.00 per hour. When due to conditions beyond the control of the <br />Employer or when an owner (not acting as the contractor), a government agency or the contract specifications require <br />that more than four (4) hours of a special shift can only be performed outside the normal 6 am to 6pm shift, then the <br />special shift premium will be applied to the basic straight time for the entire shift. When an employee works on a <br />special shift, they shall be paid a special shift premium for each hour worked unless they are in overtime or double- <br />time status. (For example, the special shift premium does not waive the overtime requirements for work performed on <br />Saturday or Sunday.) <br /> <br />Certified Crane Operator Premium: Crane operators requiring certifications shall be paid $0.50 per hour above their <br />classification rate. <br /> <br />Boom Pay Premium: All cranes including tower shall be paid as follows based on boom length: <br /> <br />(A) – 130’ to 199’ – $0.50 per hour over their classification rate. <br />(B) – 200’ to 299’ – $0.80 per hour over their classification rate. <br />(C) – 300’ and over – $1.00 per hour over their classification rate. <br />
The URL can be used to link to this page
Your browser does not support the video tag.