My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Benefit Code Key – Effective 3/5/2025 thru 8/30/2025 <br />17 | Page <br /> <br />Note Codes Continued <br /> <br /> <br />9. B. The highest pressure registered on the gauge for an accumulated time of more than fifteen (15) minutes during the <br />shift shall be used in determining the scale paid. <br /> <br />Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work <br />located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br />Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require <br />them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the <br />classification rate. <br /> <br /> C. Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work (work <br />located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. Swinging <br />Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions that require <br />them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above the <br />classification rate. <br /> <br />Effective August 31, 2012 – A Traffic Control Supervisor shall be present on the project whenever flagging or spotting <br />or other traffic control labor is being utilized. A Traffic Control Laborer performs the setup, maintenance and removal <br />of all temporary traffic control devices and construction signs necessary to control vehicular, bicycle, and pedestrian <br />traffic during construction operations. Flaggers and Spotters shall be posted where shown on approved Traffic Control <br />Plans or where directed by the Engineer. All flaggers and spotters shall possess a current flagging card issued by the <br />State of Washington, Oregon, Montana, or Idaho. These classifications are only effective on or after August 31, 2012. <br /> <br /> D. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, <br />towers, dams, bridges, power generation facilities and manufacturing facilities such as chemical plants, etc., or <br />anywhere abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsulation is required. <br /> <br /> E. Heavy Construction includes construction, repair, alteration or additions to the production, fabrication or <br />manufacturing portions of industrial or manufacturing plants, hydroelectric or nuclear power plants and atomic <br />reactor construction. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $1.00, <br />Level B: $0.75, Level C: $0.50, And Level D: $0.25. <br /> <br /> F. Industrial Painter wages are required for painting within industrial facilities such as treatment plants, pipelines, <br />towers, dams, power generation facilities and manufacturing facilities such as chemical plants, etc., or anywhere <br />abrasive blasting is necessary to prepare surfaces, or hazardous materials encapsulation is required. <br /> <br /> H. One (1) person crew shall consist of a Party Chief. (Total Station or similar one (1) person survey system). Two (2) <br />person survey party shall consist of a least a Party Chief and a Chain Person. Three (3) person survey party shall <br />consist of at least a Party Chief, an Instrument Person, and a Chain Person. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.