My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Benefit Code Key – Effective 3/5/2025 thru 8/30/2025 <br />18 | Page <br /> <br />9. I. In addition to the hourly wage and fringe benefits, the following depth and enclosure premiums shall be paid. The <br />premiums are to be calculated for the maximum depth and distance into an enclosure that a diver reaches in a day. <br />The premiums are to be paid one time for the day and are not used in calculating overtime pay. <br /> <br />Depth premiums apply to depths of fifty feet or more. Over 50' to 100' - $2.00 per foot for each foot over 50 feet. <br />Over 101' to 150' - $3.00 per foot for each foot over 101 feet. Over 151' to 220' - $4.00 per foot for each foot over <br />220 feet. Over 221' - $5.00 per foot for each foot over 221 feet. <br /> <br />Enclosure premiums apply when divers enter enclosures (such as pipes or tunnels) where there is no vertical ascent <br />and is measured by the distance travelled from the entrance. 25’ to 300’ - $1.00 per foot from entrance. 300’ to 600’ <br />- $1.50 per foot beginning at 300’. Over 600’ - $2.00 per foot beginning at 600’. <br /> <br />Employees may be required to perform any combination of work within the Diving team/crew, (with the exception <br />of dive Supervisor) provided they are paid at the highest rate at which he/she has worked for the shift. <br /> <br /> L. Workers on hazmat projects receive additional hourly premiums as follows -Level A: $0.75, Level B: $0.50, And <br />Level C: $0.25. <br /> <br />Tide Work: When employees are called out between the hours of 6:00 p.m. and 6:00 a.m. to work on tide work <br />(work located in the tide plane) all time worked shall be at one and one-half times the hourly rate of pay. <br /> <br />Swinging Stage/Boatswains Chair: Employees working on a swinging stage or boatswains chair or under conditions <br />that require them to be tied off to allow their hands to be free shall receive seventy-five cents ($0.75) per hour above <br />the classification rate. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.