Laserfiche WebLink
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-3 March 26, 2025 <br /> <br /> 1 <br />All references to “State Materials Laboratory” shall be revised to read “Contracting 2 <br />Agency designated location”. 3 <br /> 4 <br />All references to “final contract voucher certification” shall be interpreted to mean the 5 <br />Contracting Agency form(s) by which final payment is authorized, and final completion 6 <br />and acceptance granted. 7 <br /> 8 <br />Additive 9 <br />A supplemental unit of work or group of bid items, identified separately in the Bid 10 <br />Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition 11 <br />to the base bid. 12 <br /> 13 <br />Alternate 14 <br />One of two or more units of work or groups of bid items, identified separately in the Bid 15 <br />Proposal, from which the Contracting Agency may make a choice between different 16 <br />methods or material of construction for performing the same work. 17 <br /> 18 <br />Business Day 19 <br />A business day is any day from Monday through Friday except holidays as listed in 20 <br />Section 1-08.5. 21 <br /> 22 <br />Contract Bond 23 <br />The definition in the Standard Specifications for “Contract Bond” applies to whatever 24 <br />bond form(s) are required by the Contract Documents, which may be a combination of a 25 <br />Payment Bond and a Performance Bond. 26 <br /> 27 <br />Contract Documents 28 <br />See definition for “Contract”. 29 <br /> 30 <br />Contract Time 31 <br />The period of time established by the terms and conditions of the Contract within which 32 <br />the Work must be physically completed. 33 <br /> 34 <br />Notice of Award 35 <br />The written notice from the Contracting Agency to the successful Bidder signifying the 36 <br />Contracting Agency’s acceptance of the Bid Proposal. 37 <br /> 38 <br />Notice to Proceed 39 <br />The written notice from the Contracting Agency or Engineer to the Contractor authorizing 40 <br />and directing the Contractor to proceed with the Work and establishing the date on which 41 <br />the Contract time begins. 42 <br /> 43 <br />Traffic 44 <br />Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and 45 <br />equestrian traffic. 46 <br /> 47