My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-4 March 26, 2025 <br /> <br />1-02.1.RTF 1 <br />1-02 BID PROCEDURES AND CONDITIONS 2 <br /> 3 <br />1-02.1 Prequalification of Bidders 4 <br /> 5 <br />Delete this section and replace it with the following: 6 <br /> 7 <br />1-02.1 Qualifications of Bidder 8 <br />(January 24, 2011 APWA GSP) 9 <br /> 10 <br />Before award of a public works contract, a bidder must meet at least the minimum 11 <br />qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to 12 <br />be awarded a public works project. 13 <br /> 14 <br />1-02.2.RTF 15 <br />1-02.2 Plans and Specifications 16 <br />(City of Everett, based on June 27, 2011 APWA GSP) 17 <br /> 18 <br />Delete this section and replace it with the following: 19 <br /> 20 <br />Information as to where Bid Documents can be obtained or reviewed can be found in the 21 <br />Call for Bids (Advertisement for Bids) for the work. 22 <br /> 23 <br />After award of the contract, plans and specifications will be issued to the Contractor at no 24 <br />cost as detailed below: 25 <br /> 26 <br />To Prime Contractor No. of Sets Basis of Distribution <br />Reduced plans (11" x 17") 8 Furnished automatically <br />upon award. <br />Contract Provisions <br /> <br />4 Furnished automatically <br />upon award. <br />Large plans (e.g., 22" x <br />34") <br />2 Furnished only upon <br />request. <br /> 27 <br />Additional plans and Contract Provisions may be obtained by the Contractor from the 28 <br />source stated in the Call for Bids, at the Contractor’s own expense. 29 <br /> 30 <br />1-02.4(1).OptionA.RTF 31 <br />1-02.4(1) General 32 <br />(December 30, 2022 APWA GSP Option A) 33 <br /> 34 <br />The first sentence of the ninth paragraph, beginning with “Prospective Bidder desiring…”, 35 <br />is revised to read: 36 <br /> 37 <br />Prospective Bidders desiring an explanation or interpretation of the Bid Documents, 38 <br />shall request the explanation or interpretation in writing soon enough to allow a written 39 <br />reply to reach all prospective Bidders before the submission of their Bids. 40 <br /> 41
The URL can be used to link to this page
Your browser does not support the video tag.