My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-6 March 26, 2025 <br /> <br />The Bidder shall submit with the Bid, its proposal for incorporating recycled materials into 1 <br />the project, using the form provided in the Contract Provisions. 2 <br /> 3 <br />1-02.7.RTF 4 <br />1-02.7 Bid Deposit 5 <br />(March 8, 2013 APWA GSP) 6 <br /> 7 <br />Supplement this section with the following: 8 <br /> 9 <br />Bid bonds shall contain the following: 10 <br />1. Contracting Agency-assigned number for the project; 11 <br />2. Name of the project; 12 <br />3. The Contracting Agency named as obligee; 13 <br />4. The amount of the bid bond stated either as a dollar figure or as a percentage which 14 <br />represents five percent of the maximum bid amount that could be awarded; 15 <br />5. Signature of the bidder’s officer empowered to sign official statements. The signature 16 <br />of the person authorized to submit the bid should agree with the signature on the 17 <br />bond, and the title of the person must accompany the said signature; 18 <br />6. The signature of the surety’s officer empowered to sign the bond and the power of 19 <br />attorney. 20 <br /> 21 <br />If so stated in the Contract Provisions, bidder must use the bond form included in the 22 <br />Contract Provisions. 23 <br /> 24 <br />If so stated in the Contract Provisions, cash will not be accepted for a bid deposit. 25 <br /> 26 <br />1-02.10.RTF 27 <br />1-02.10 Withdrawing, Revising, or Supplementing Proposal 28 <br />(July 23, 2015 APWA GSP) 29 <br /> 30 <br />Delete this section, and replace it with the following: 31 <br /> 32 <br />After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may 33 <br />withdraw, revise, or supplement it if: 34 <br /> 35 <br />1. The Bidder submits a written request signed by an authorized person and 36 <br />physically delivers it to the place designated for receipt of Bid Proposals, and 37 <br />2. The Contracting Agency receives the request before the time set for receipt of 38 <br />Bid Proposals, and 39 <br />3. The revised or supplemented Bid Proposal (if any) is received by the Contracting 40 <br />Agency before the time set for receipt of Bid Proposals. 41 <br /> 42 <br />If the Bidder’s request to withdraw, revise, or supplement its Bid Proposal is received 43 <br />before the time set for receipt of Bid Proposals, the Contracting Agency will return the 44 <br />unopened Proposal package to the Bidder. The Bidder must then submit the revised or 45 <br />supplemented package in its entirety. If the Bidder does not submit a revised or 46 <br />supplemented package, then its bid shall be considered withdrawn. 47 <br /> 48
The URL can be used to link to this page
Your browser does not support the video tag.