My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-5 March 26, 2025 <br /> <br />1-02.5.RTF 1 <br />1-02.5 Proposal Forms 2 <br />(November 25, 2024 APWA GSP) 3 <br /> 4 <br />Delete this section and replace it with the following: 5 <br /> 6 <br />The Proposal Form will identify the project and its location and describe the work. It will 7 <br />also list estimated quantities, units of measurement, the items of work, and the materials 8 <br />to be furnished at the unit bid prices. The bidder shall complete spaces on the proposal 9 <br />form that call for, but are not limited to, unit prices; extensions; summations; the total bid 10 <br />amount; signatures; date; and, where applicable, retail sales taxes and acknowledgment 11 <br />of addenda; the bidder’s name, address, telephone number, and signature; the bidder’s 12 <br />DBE commitment, if applicable; a State of Washington Contractor’s Registration 13 <br />Number; and a Business License Number, if applicable. Bids shall be in legible figures 14 <br />(not words) written in ink or typed and expressed in U.S. dollars. The required 15 <br />certifications are included as part of the Proposal Form. 16 <br /> 17 <br />The Contracting Agency reserves the right to arrange the proposal forms with alternates 18 <br />and additives, if such be to the advantage of the Contracting Agency. The bidder shall 19 <br />bid on all alternates and additives set forth in the Proposal Form unless otherwise 20 <br />specified. 21 <br /> 22 <br />1-02.6.GR1 23 <br />Preparation of Proposal 24 <br /> 25 <br />1-02.6.INST3.GR1 26 <br />Section 1-02.6 is supplemented with the following: 27 <br /> 28 <br />1-02.6.OptionC.RTF 29 <br />Subcontractor’s List 30 <br />(November 25, 2024 APWA GSP 1-02.6, Option C) 31 <br />The fourth paragraph of Section 1-02.6 is revised to read: 32 <br /> 33 <br />The Bidder shall submit with the Bid the completed Subcontractor List included in the 34 <br />Contracting Agency Proposal Package. If a Subcontractor List Form is not included in 35 <br />the package, use DOT Form 271-015A. The Form shall contain the following: 36 <br /> 37 <br />1. Subcontractors who will perform the work of structural steel installation, rebar 38 <br />installation, heating, ventilation, air conditioning, and plumbing as described in 39 <br />RCW 18.106 and electrical as described in RCW 19.28, 40 <br />2. The Work those subcontractors will perform on the Contract as described in 41 <br />RCW 39.30.060; and 42 <br />3. No more than one subcontractor for each category of work identified, except, 43 <br />when subcontractors vary with Bid alternates, in which case the Bidder shall 44 <br />identify which subcontractor will be used for which alternate. 45 <br /> 46 <br />1-02.6(1).RTF 47 <br />Add the following new section: 48 <br /> 49 <br />1-02.6(1) Recycled Materials Proposal 50 <br />(January 4, 2016 APWA GSP) 51 <br /> 52
The URL can be used to link to this page
Your browser does not support the video tag.