My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
????9929U 406 <br /> RESET <br /> 198933408612950975 <br />7 <br />3 <br />. <br />7 <br />4 <br />8 <br />?????? <br />? <br />?Surveyed By Date Control Monument City of Everett Field Book/Starting Page / C3 <br />5 <br /> <br /> <br /> <br /> EVERGREEN WAY <br />Filepath\FilenameS:\1COMMON\ENGINEERING PROJECTS\PW 3830 2025 OVERLAY\300 CAD-BIM\SHEET\EVERGREEN WAY - EMW TO 100TH ST SW.DWGPlot date 3/25/2025 2:20 PM Plotted by Brian Defreese Last saved by BDefreese Plot style Everett-2016.stb Sheetset Name 2025 PMO---- NORTHBOUND CURB LANE ONLY <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov REGION - 10 | STATE - WA <br />2025 PAVEMENT MAINTENANCE <br />OVERLAY <br />WORK ORDER 3830 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />18RECORD <br />Of Total <br />Sheet No. <br />DrawingBED, GSL <br />DTE <br />BED <br />----SEE ABOVEPLAN SEE BELOW10 4020200 <br />SCALE <br />FEETSEE DRAWING C2EVERGREEN WAY <br />100TH ST <br /> SW <br />1.INSTALL A 4-TURN 6 FT DIAMETER ROUND LOOP PER STANDARD <br />DRAWINGS 805, 809 AND 810. <br />1 <br />CONSTRUCTION NOTES:X <br />Digitally signed by Daniel Enrico, P.E. <br />Date: 2025.03.26 14:55:11-07'00' <br />3/26/2025 GSL
The URL can be used to link to this page
Your browser does not support the video tag.