My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
12 <br />1 <br />0 <br />12 <br />1 <br />7 <br />12 <br />3 <br />0 <br />12 <br />0 <br />2 <br />12 <br />2 <br />4 <br />13 <br />0 <br />4 <br />63 <br />1 <br /> <br />5 <br />8 <br /> <br />0 <br />1 <br />34 <br />0 <br />6 <br />7 <br />5 <br />. <br />3 <br />4 <br />6 <br />13 <br />0 <br />1 <br />4 <br />7 <br />1 <br />. <br />6 <br />8 <br />2 <br />P/L <br />P/LP/LP/LP/LP/LP/LP/L <br />P/LP/LP/LP/LP/L <br />P/LP/LP/LP/LP/L31.9'20.2'20.8'6.0'13.5'15.4'6.0'6.0'6.0'15.1'13.8'6.0'6.0'6.0'6.0'14.8'13.4'21.0'13.0'41.3'41.2'13 <br />1 <br />0 <br />11 <br />2 <br />1 <br />11 <br />2 <br />7 <br />11 <br />1 <br />1 <br />11 <br />0 <br />7 <br />63 <br />1 <br /> <br />5 <br />9 <br /> <br />0 <br />1 <br />34 <br />0 <br />4 <br />5 <br />4 <br />. <br />2 <br />3 <br />5 <br />13 <br />0 <br />1 <br />1 <br />2 <br />6 <br />. <br />4 <br />0 <br />3 <br />63 <br />1 <br /> <br />6 <br />0 <br /> <br />0 <br />1 <br />34 <br />0 <br />2 <br />9 <br />6 <br />. <br />5 <br />5 <br />9 <br />13 <br />0 <br />0 <br />8 <br />8 <br />0 <br />. <br />1 <br />1 <br />1 <br />P/LP/LP/LP/LP/LP/L <br />P/LP/LP/LP/ <br />L <br />P/L <br />P <br />/ <br />L <br />P/LP/LP/LP/LP/LP/LP/LP/L <br />P/LP/L40.5'22.8'26.2'12.6'16.4'6.0'6.0'6.0'6.0'6.0'6.0'13.5'15.0'13.5'21.0'41.3'31.3' <br />Of Total <br />Sheet No. <br />DrawingSurveyed By Date Control Monument City of Everett Field Book/Starting Page / C4 <br />6 <br /> <br />E CASINO RD <br />Filepath\FilenameS:\1COMMON\ENGINEERING PROJECTS\PW 3830 2025 OVERLAY\300 CAD-BIM\SHEET\E CASINO RD - BRUIN TO BEVERLY BLVD.DWGPlot date 3/25/2025 2:21 PM Plotted by Brian Defreese Last saved by BDefreese Plot style Everett-2016.stb Sheetset Name 2025 PMO BRUIN BLVD TO 1310 <br />Designed <br />ACTION APRVDDATE <br />Drawn <br />Checked <br />REVISIONDATENO.APRVD <br />PLANS ISSUED FOR 3200 Cedar Street <br />Everett, WA 98201 <br />425.257.8800 everettwa.gov REGION - 10 | STATE - WA <br />2025 PAVEMENT MAINTENANCE <br />OVERLAY <br />WORK ORDER 3830 <br />ACTION APRVDDATE ACTION APRVDDATE <br />BID CONST <br />Design Review Level <br />18RECORD <br />Of Total <br />Sheet No. <br />DrawingBED, GSL <br />DTE <br />BED <br />---- <br />10 402020FEET0 <br />PLAN SEE BELOWSEE ABOVESEE DRAWING C5E CASINO RDBRUIN BLVDE CASINO RD XAVIERWAYKOSSUTHAVEDigitally signed by Daniel Enrico, P.E. <br />Date: 2025.03.26 14:55:12-07'00' <br />3/26/2025 GSL
The URL can be used to link to this page
Your browser does not support the video tag.