My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-50 March 26, 2025 <br /> <br />of the Engineer. The reference line may be removed after the completion of the first 1 <br />course of HMA when approved by the Engineer. Whenever the Engineer determines that 2 <br />any of these methods are failing to provide the necessary vertical control, the reference 3 <br />lines will be reinstalled by the Contractor. 4 <br /> 5 <br />The Contractor shall furnish and install all pins, brackets, tensioning devices, wire, and 6 <br />accessories necessary for satisfactory operation of the automatic control equipment. 7 <br /> 8 <br />If the paving machine in use is not providing the required finish, the Engineer may 9 <br />suspend Work as allowed by Section 1-08.6. Any cleaning or solvent type liquids spilled 10 <br />on the pavement shall be thoroughly removed before paving proceeds. 11 <br /> 12 <br />5-04.3(3)D Material Transfer Device or Material Transfer Vehicle 13 <br />A Material Transfer Device/Vehicle (MTD/V) shall only be used with the Engineer’s 14 <br />approval, unless otherwise required by the Contract. 15 <br /> 16 <br />Where an MTD/V is required by the Contract, the Engineer may approve paving without 17 <br />an MTD/V, at the request of the Contractor. The Engineer will determine if an equitable 18 <br />adjustment in cost or time is due. 19 <br /> 20 <br />When used, the MTD/V shall mix the HMA after delivery by the hauling equipment and 21 <br />prior to laydown by the paving machine. Mixing of the HMA shall be sufficient to obtain a 22 <br />uniform temperature throughout the mixture. If a windrow elevator is used, the length of 23 <br />the windrow may be limited in urban areas or through intersections, at the discretion of 24 <br />the Engineer. 25 <br /> 26 <br />To be approved for use, an MTV: 27 <br /> 28 <br />1. Shall be self-propelled vehicle, separate from the hauling vehicle or paver. 29 <br /> 30 <br />2. Shall not be connected to the hauling vehicle or paver. 31 <br /> 32 <br />3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 33 <br /> 34 <br />4. Shall mix the HMA after delivery by the hauling equipment and prior to 35 <br />placement into the paving machine. 36 <br /> 37 <br />5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the 38 <br />mixture. 39 <br /> 40 <br />To be approved for use, an MTD: 41 <br /> 42 <br />1. Shall be positively connected to the paver. 43 <br /> 44 <br />2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow. 45
The URL can be used to link to this page
Your browser does not support the video tag.