My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-51 March 26, 2025 <br /> <br /> 1 <br />3. Shall mix the HMA after delivery by the hauling equipment and prior to 2 <br />placement into the paving machine. 3 <br /> 4 <br />4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the 5 <br />mixture. 6 <br /> 7 <br />5-04.3(3)E Rollers 8 <br />Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good 9 <br />condition and capable of reversing without backlash. Operation of the roller shall be in 10 <br />accordance with the manufacturer’s recommendations. When ordered by the Engineer 11 <br />for any roller planned for use on the project, the Contractor shall provide a copy of the 12 <br />manufacturer’s recommendation for the use of that roller for compaction of HMA. The 13 <br />number and weight of rollers shall be sufficient to compact the mixture in compliance 14 <br />with the requirements of Section 5-04.3(10). The use of equipment that results in 15 <br />crushing of the aggregate will not be permitted. Rollers producing pickup, washboard, 16 <br />uneven compaction of the surface, displacement of the mixture or other undesirable 17 <br />results shall not be used. 18 <br /> 19 <br />5-04.3(4) Preparation of Existing Paved Surfaces 20 <br />When the surface of the existing pavement or old base is irregular, the Contractor shall 21 <br />bring it to a uniform grade and cross-section as shown on the Plans or approved by the 22 <br />Engineer. 23 <br /> 24 <br />Preleveling of uneven or broken surfaces over which HMA is to be placed may be 25 <br />accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as 26 <br />approved by the Engineer. 27 <br /> 28 <br />Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may 29 <br />require the use of small steel wheel rollers, plate compactors, or pneumatic rollers to 30 <br />avoid bridging across preleveled areas by the compaction equipment. Equipment used 31 <br />for the compaction of preleveling HMA shall be approved by the Engineer. 32 <br /> 33 <br />Before construction of HMA on an existing paved surface, the entire surface of the 34 <br />pavement shall be clean. All fatty asphalt patches, grease drippings, and other 35 <br />objectionable matter shall be entirely removed from the existing pavement. All 36 <br />pavements or bituminous surfaces shall be thoroughly cleaned of dust, soil, pavement 37 <br />grindings, and other foreign matter. All holes and small depressions shall be filled with an 38 <br />appropriate class of HMA. The surface of the patched area shall be leveled and 39 <br />compacted thoroughly. Prior to the application of tack coat, or paving, the condition of 40 <br />the surface shall be approved by the Engineer. 41 <br /> 42 <br />A tack coat of asphalt shall be applied to all paved surfaces on which any course of HMA 43 <br />is to be placed or abutted; except that tack coat may be omitted from clean, newly paved 44 <br />surfaces at the discretion of the Engineer. Tack coat shall be uniformly applied to cover 45 <br />the existing pavement with a thin film of residual asphalt free of streaks and bare spots at 46 <br />a rate between 0.02 and 0.10 gallons per square yard of retained asphalt. The rate of 47 <br />application shall be approved by the Engineer. A heavy application of tack coat shall be 48
The URL can be used to link to this page
Your browser does not support the video tag.