Granite Construction Company 5/16/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 5/16/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/25/2025 11:04:07 AM
Creation date
5/16/2025 9:53:49 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
5/16/2025
Council Approval Date
5/7/2025
Department
Public Works
Department Project Manager
Dan Erico
Subject / Project Title
2025 PAVEMENT MAINTENANCE OVERLAY
Public Works WO Number
COE PW WO# 3830
Tracking Number
0004830
Total Compensation
$1,327,733.50
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Granite Construction Company 8/25/2025 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
294
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 PAVEMENT MAINTENANCE OVERLAY SPECIAL PROVISIONS <br />PW# 3830 <br /> SP-82 March 26, 2025 <br /> <br />(******) 1 <br />"Vehicle Loop Detectors," per linear foot. 2 <br /> 3 <br />The unit contract price shall include saw cutting, cleaning and drying of pavement, 4 <br />installing loops and home runs, loop lead-in conduits, loop wire, sealant, splice kit and 5 <br />splicing between loop wire and lead-on cable, any work necessary to access a junction 6 <br />box and testing of the vehicle detectors as defined in Section 8-20.3(14)D. 7 <br /> 8 <br />No payment shall be made for any loops that are not spliced and fully operational, 9 <br />including any loop detector lead in cable required to make the loop operational. 10 <br /> 11 <br />“Loop Detector Lead-In Cable”, per linear foot. 12 <br /> 13 <br />The unit contract price shall be full pay for furnishing and installing each loop detector 14 <br />lead-In cable in existing conduits between the traffic signal control cabinet and loop splice 15 <br />point, including all and all other Work necessary terminate loop lead in cable at either end. 16 <br /> 17 <br />No payment shall be made for any detector lead-in cable that is not spliced and fully 18 <br />operational, including any testing required to make the loop operational. 19 <br /> 20 <br />“Conduit Pipe 2 In. Diam.”, per linear foot. 21 <br />The unit contract price shall be full pay as described in this Section for furnishing and 22 <br />installing each conduit stub-out where shown in the Plans, including furnishing all conduit, 23 <br />elbows, bends, and fittings for placing the pipe in accordance with the above provisions, 24 <br />including all excavation or jacking required, backfilling of any voids around stub out, pits, 25 <br />or trenches; bedding of the pipe, chipping of pavement, and all other Work necessary for 26 <br />the construction of the conduit stub-out. 27 <br /> 28 <br />“Video Detection System ____”, lump sum. 29 <br /> 30 <br />The lump sum Contract price for “Video Detection System ____”, shall be full pay for the 31 <br />construction of the complete video detection system as described above and as shown 32 <br />in the Plans, and herein specified, including complete installation of owner furnished 33 <br />materials to provide a fully functioning video detection system at the location described. 34 <br />The Contract price shall include restoring facilities destroyed or damaged during 35 <br />construction, salvaging existing materials, and for making all required tests. All additional 36 <br />materials and labor, not shown in the Plans or called for herein and which are required to 37 <br />complete the video detection system, shall be included in the lump sum Contract price. 38 <br />Removal and salvage of existing materials associated with the construction not shown in 39 <br />the Plans or called for herein and which are required to complete the video detection 40 <br />system, shall be included in the lump sum Contract price. 41 <br /> 42 <br /> 43 <br />CNH 8-22.DOCX 44 <br />8-22 PAVEMENT MARKING 45 <br /> 46 <br />8-22.2 Materials 47 <br /> 48 <br />Section 8-22.2 is supplemented with the following: 49 <br /> 50 <br />(******) 51