Laserfiche WebLink
Project: Riverfront Development Sanitary Sewer <br /> Lift Station Improvements <br /> Change Order No.5 <br /> Change Order Effective Date: April 22, 2016 <br /> Date: 5 j'zIg) Date: Date: Date: <br /> CONTRACTOR <br /> By /NW � Date: <br /> Officer <br /> Exhibit A—Description of Changed Work <br /> This change order# 5 adds three (3) new bid items to Schedule "A", adds two (2) new bid items to <br /> Schedule "B" , modifies one (1) existing bid item in Schedule "A", and modifies one (1) existing bid <br /> items in Schedule "B" as shown below. <br /> Added Bid Items <br /> Schedule "A" Bid Item #205–Lift Station 33 Electrical and Instrument Modifications. Add new <br /> bid item# 205, entitled"Lift Station 33 Electrical and Instrument Modifications" at the agreed to lump <br /> sum price of$3,022.24, resulting in a$3,022.24 increase to the Contract price. <br /> Schedule "A" Bid Item #206–Lift Station 33-Eliminate Gypsum Wallboard. Add new bid item# <br /> 206, entitled "Lift Station 33-Eliminate Gypsum Wallboard" at the agreed to cost credit of$10,300.00, <br /> resulting in a$10,300.00 decrease to the Contract price. <br /> Schedule "A" Bid Item #207–Lift Station 33 PUD Power Installation. Add new bid item# 207, <br /> entitled"Lift Station 33 PUD Power Installation" at the agreed to lump sum price of$9,501.61, <br /> resulting in a$9,501.61 increase to the Contract price. <br /> Schedule "B" Bid Item # 107–Lift Station 43 Electrical and Instrument Modifications. Add new <br /> bid item# 107, entitled"Lift Station 43 Electrical and Instrument Modifications" at the agreed to lump <br /> sum price of$3,022.24, resulting in a$3,022.24 increase to the Contract price. <br /> Schedule "B" Bid Item # 108–Lift Station 43-Eliminate Gypsum Wallboard. Add new bid item <br /> # 108, entitled"Lift Station 43-Eliminate Gypsum Wallboard" at the agreed to cost credit of <br /> $3,000.00, resulting in a$3,000.00 decrease to the Contract price. <br /> Modified Bid Items <br /> Page 3 of 4 <br />