Change Order No. 5
>
Contracts
>
Capital Contract
>
Change Order No. 5
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2016 9:41:07 AM
Creation date
6/15/2016 9:41:05 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
McClure & Sons, Inc.
Approval Date
6/8/2016
Council Approval Date
6/1/2016
Department
Public Works
Department Project Manager
Tom Fuchs
Subject / Project Title
Riverfront Sanitary Sewer Lift Station Impvts
Public Works WO Number
RD 3314-2/UP 3597-3
Amendment/Change Order
Change Order
Amendment/Change Order Number
5
Total Compensation
$82,246.09
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Riverfront Development Sanitary Sewer <br /> Lift Station Improvements <br /> Change Order No.5 <br /> Change Order Effective Date: April 22, 2016 <br /> Schedule "A" Bid Item #22—Force Account. Modify existing bid item# 22 entitled, "Force <br /> Account" by adding $40,000.00 to the Contract, resulting in a$40,000.00 increase to the Contract <br /> price. <br /> Schedule "B" Bid Item # 104—Force Account. Modify existing bid item# 104 entitled, "Force <br /> Account" by adding $40,000.00 to the Contract, resulting in a$40,000 increase to the Contract price. <br /> Exhibit B—Justification <br /> Schedule "A" Bid Item #205—Lift Station 33 Electrical and Instrument Modifications. <br /> Schedule "B" Bid Item # 107—Lift Station 43 Electrical and Instrument Modifications. <br /> The City of Everett directed the contractor to install different instrumentation equipment than was <br /> required in the contract. These bid items are being added to account for costs to pay for <br /> instrumentation equipment to be installed, minus credits to the City of Everett for materials originally <br /> specified for this work at Lift Station 33 and 43. <br /> Schedule "A" Bid Item #206—Lift Station 33-Eliminate Gypsum Wallboard. <br /> Schedule "B" Bid Item # 108—Lift Station 43-Eliminate Gypsum Wallboard. <br /> The City of Everett directed the contractor to eliminate Gypsum Wallboard from the Contract because <br /> it is not a necessary material for the inside of a Sewer Lift Station Structure. The Contractor is <br /> providing an equitable adjustment cost credit to the City of Everett for the elimination of Gypsum <br /> Wallboard, and these bid items are being added to account for those cost credits. <br /> Schedule "A" Bid Item #207—Lift Station 33 PUD Power Installation. Snohomish County PUD <br /> required the installation of electrical conduit, and vaults before they would agree to provide power to <br /> Lift Station 33. This bid item is being added to account for costs to pay for work required by PUD. <br /> Schedule "A" Bid Item #22—Force Account. <br /> Schedule "B" Bid Item # 104—Force Account. <br /> These bid items have overrun their plan quantities and are being modified to account for and pay for <br /> costs incurred by the quantities overrun plus future increases to these bid items. <br /> This Change Order# 5 results in an increase to the Contract price of$82,246.48. <br /> Exhibit C—Contract Time <br /> Two (2)working days are added to the Contract time resulting from Change Order# 5 to <br /> account for additional electrical power work that was not part of the Contract. <br /> Page 4 of 4 <br />