My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 4/7/2025 Amendment 1
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
WA ST Military Dept 4/7/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 10:22:35 AM
Creation date
5/16/2025 10:05:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
4/7/2025
Council Approval Date
4/16/2025
End Date
4/30/2026
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003456
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Attachment 1 <br />Washington State Military Department <br />SPECIAL TERMS AND CONDITIONS <br />I. KEY PERSONNEL: <br />The individuals listed below shall be considered key personnel for point of contact under this Agreement. Any <br />substitution of key personnel by either party shall be made by written notification to the current key personnel. <br />SUBRECIPIENT <br />MILITARY DEPARTMENT <br />Tim <br />Cook <br />Name <br />Shaun <br />Bridge <br />Name <br />Title <br />State <br />Hazard <br />Mitigation <br />Officer <br />Title <br />Public <br />Works <br />Finance <br />& <br />tim.cook@mil.wa.gov <br />Sbridge(d <br />everettwa.gov <br />E-Mail <br />E-Mail <br />253-512-7072 <br />425-257-8823 <br />Phone <br />Phone <br />Hanna <br />Lintukorpi <br />Ryan <br />Chandler <br />Name <br />Name <br />`Title <br />Title <br />HMA Program <br />Supervisor <br />Associate <br />Engineer <br />Ryan.chandler@mil.wa.gov <br />E-Mail <br />hlintukorpi(&severettwa.gov <br />E-Mail <br />253-512-7460 <br />425-257-8946 <br />Phone <br />Phone <br />Logan <br />Mast <br />Name <br />Randy Loveless <br />Name <br />Title <br />Senior <br />Engineer <br />HMA Program <br />Coordinator <br />Title <br />Logan.mast@mil.wa.gov <br />rloveless(a�everettwa.gov, <br />E-Mail <br />E-Mail <br />253-512-7023 <br />425-257-8815 <br />Phone <br />Phone <br />ARTICLE II ADMINISTRATIVE REQUIREMENTS <br />The SUBRECIPIENT shall comply with all applicable state and federal laws, rules, regulations, requirements, <br />and program guidance identified or referenced in this Agreement and the informational documents published by <br />DHS/FEMA applicable to the HMGP program including, but not limited to, all criteria, restrictions, and <br />requirements of the Presidential Disaster Declaration, the federal regulations commonly applicable to FEMA <br />grants, and the FEMA Award Letter and its attachments, all of which are incorporated herein by reference. <br />The SUBRECIPIENT acknowledges that since this Agreement involves federal award funding, the period of <br />performance described herein may begin prior to the availability of appropriated federal funds. The <br />SUBRECIPIENT agrees that it will not hold the DEPARTMENT, the State of Washington, or the United States <br />liable for any damages, claim for reimbursement, or any type of payment whatsoever for services performed <br />under this Agreement prior to distribution of appropriated federal funds, or if federal funds are not appropriated <br />or in a particular amount. <br />A. STATE AND FEDERAL REQUIREMENTS FOR HAZARD MITIGATION GRANTS: <br />The following requirements apply to all DHS/FEMA Hazard Mitigation Grants administered by the <br />DEPARTMENT. <br />1. SUBAWARDS & CONTRACTS BY SUBRECIPIENTS <br />a. The SUBRECIPIENT must make a case -by -case determination whether each agreement <br />it makes for the disbursement of HMGP funds received under this Agreement casts the <br />party receiving the funds in the role of a SUBRECIPIENT or contractor in accordance with <br />2 CFR 200.331. <br />b. If the SUBRECIPIENT becomes a pass -through entity by making a subaward to a non- <br />federal entity as its subrecipient: <br />i. The Subrecipient must comply with all federal laws and regulations applicable to <br />pass -through entities of HMGP funds, including, but not limited to, those <br />contained in 2 CFR 200. <br />ii. The Subrecipient shall require its subrecipient(s) to comply with all applicable <br />state and federal laws, rules, regulations, requirements, and program guidance <br />identified or referenced in this Agreement and the informational documents <br />published by DHS/FEMA applicable to 5320-23-R, including, but not limited to, <br />Mitigation Project Grant Agreement — REV 8/8/23 Page 2 of 30 City of Everett, D25-042-Revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.