My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 4/7/2025 Amendment 1
>
Contracts
>
Agreement
>
Grant Agreement (City as Grantee)
>
WA ST Military Dept 4/7/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2025 10:22:35 AM
Creation date
5/16/2025 10:05:59 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
4/7/2025
Council Approval Date
4/16/2025
End Date
4/30/2026
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0003456
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Grant Agreement (City as Grantee)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
proposed project has the potential to impact environmental resources and/or historic <br />properties. <br />d. The SUBRECIPIENT agrees that to receive any federal preparedness funding, all EHP <br />compliance requirements outlined in applicable guidance must be met. The EHP review <br />process must be completed and FEMA approval received by the SUBRECIPIENT, <br />before any work is started for which reimbursement will be later requested. Expenditures <br />for projects started before completion of the EHP review process, and receipt of approval <br />by the SUBRECIPIENT will not be reimbursed. <br />12 ADDITIONAL SPECIAL CONDITIONS <br />a. Construction Documents, Contracts, Change Orders <br />Construction Document Approval: Upon request, the SUBRECIPIENT agrees to <br />submit one copy of all construction plans and specifications to the DEPARTMENT <br />prior to solicitation of bids. This request is to ensure bid set consistency with the <br />subgrant's approved scope of work. <br />ii. The SUBRECIPIENT shall use a competitive procurement process in the <br />procurement and award of any contracts with contractors or sub -contractors that <br />are entered into under the original contract award Copies of all bids and contracts <br />awarded shall be submitted to the DEPARTMENT upon request. Where all bids <br />are substantially in excess of project estimates, the DEPARTMENT may, by notice <br />in writing, suspend the project for determination of appropriate action, which may <br />include termination of the Agreement. <br />Construction Change Order: All change orders must be in writing and shall be <br />submitted to the DEPARTMENT The SUBRECIPIENT shall pay any increase in <br />the cost of the project as the result of a change order, unless the DEPARTMENT <br />has agreed to the change with a written amendment to this Agreement. <br />13. EQUIPMENT AND TRACKABLE ASSETS MANAGEMENT <br />a. If applicable the SUBRECIPIENT and any non-federal entity to which the <br />SUBRECIPIENT makes a subaward shall comply with 2 CFR 200 317 through 200 327, <br />and all Washington State procurement requirements, when procuring any equipment or <br />trackable assets under this Agreement, 2 CFR 200.313 for management of equipment, <br />and 2 CFR 200 to include but not limited to: <br />i. Upon successful completion of the terms of this Agreement, all equipment and <br />trackable assets purchased through this Agreement will be owned by the <br />SUBRECIPIENT, or a recognized non-federal entity to which the SUBRECIPIENT <br />has made a subaward, for which a contract or other means of legal transfer of <br />ownership is in place. <br />ii. All equipment, and trackable assets as applicable, purchased under this <br />Agreement will be recorded and maintained in the SUBRECIPIENT's inventory <br />system. <br />Inventory records shall include: <br />A. Description of the property <br />B Manufacturer's serial number, or other identification number <br />C. Funding source for the property, including the Federal Award Identification <br />Number (FAIN) (Face Sheet, Box 11) <br />D Assistance Listings Number (formerly CFDA Number) (Face Sheet, Box <br />13) <br />E Who holds the title <br />F. Acquisition date <br />G. Cost of the property and the percentage of federal participation in the cost <br />Mitigation Project Grant Agreement -- REV 8/8/23 Page 9 of 30 City of Everett, D25-042-Revised <br />
The URL can be used to link to this page
Your browser does not support the video tag.