My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Braun Northwest, Inc. 5/18/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Braun Northwest, Inc. 5/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 12:36:03 PM
Creation date
5/22/2025 12:33:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Braun Northwest, Inc.
Approval Date
5/18/2025
End Date
12/31/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Refurbished 2016 North Star Vehicle
Tracking Number
0004841
Total Compensation
$191,550.21
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Previous build #2205-3 <br />BraunNW (jg/jw) 15 of 34 Everett Fire Dept. <br />5-5-25 Original build #/2205-3 Remount Specification <br />3 COATINGS AND FINISHES <br />Disclaimer: Inspect module at preconstruction meeting. If damage is discovered, a <br />detailed scope of work, and customer authorization is required before repairs are <br />made. <br />•Modify holes from existing #90E000ZR scene lights to accommodate new #904SLC <br />EZ scene lights prior to repainting. <br />•Modify holes from existing #50C000ZR scene lights to accommodate new #M62SLC <br />EZ scene lights prior to repainting. <br />•Modify hole from existing hole for Voyager back up camera to accommodate for new <br />Zorg back up camera. <br />•Modify hole from existing shoreline connection to accommodate a new shoreline <br />connection with a new stainless steel plate and new indicator light. <br />•Transfer and mark locations of existing antennas prior to repainting. <br />•Modify holes from contact door switches on curbside passage door before repainting. <br />3.01 MODULE FINISH PREPARATION <br />Sand module smooth to remove imperfections on aluminum. Mechanically etch the entire <br />exterior and wash with wax and grease remover to ensure proper primer and paint adhesion. <br />3.02 MODULE PRIMER <br />Seal module with two-component, low VOC, direct-to-metal epoxy primer/sealant prior to <br />applying the finish coat of acrylic urethane paint. <br />3.03 PAINT TYPE <br />Sherwin Williams acrylic urethane. <br />3.04 COLOR SCHEME <br />Base color: painted to match Race Red (G4-100871777) <br />Reference build #3162-3: <br />Stripe #1 Color: 3M Ruby Red #680-CR-82 and Yellow #680-CR-71 <br />Size: 6″H <br />Style: Chevrons <br />Material: Scotchlite <br />Location: Rear of module, below drip rail, stopping short of the <br />outboard corner radius, above and outboard of rear <br />passage doors. (Excludes doors.) <br />3.04.01A CHASSIS COLOR <br />Chassis to be OEM Race Red (PQ).
The URL can be used to link to this page
Your browser does not support the video tag.