Laserfiche WebLink
Previous build #2205-3 <br />BraunNW (jg/jw) 7 of 34 Everett Fire Dept. <br />5-5-25 Original build #/2205-3 Remount Specification <br />2 MODULAR CONSTRUCTION <br />Disclaimer: Inspect module at preconstruction meeting. If damage is discovered, a <br />detailed scope of work, and customer authorization is required before repairs are <br />made. <br />•Modify holes from existing #90E000ZR scene lights to accommodate new #904SLC <br />EZ scene lights prior to repainting. <br />•Modify holes from existing #50C000ZR scene lights to accommodate new #M62SLC <br />EZ scene lights prior to repainting. <br />•Modify hole from existing hole for Voyager back up camera to accommodate for new <br />Zorg back up camera. <br />•Modify hole from existing shoreline connection to accommodate a new shoreline <br />connection with a new stainless steel plate and a new indicator light. <br />•Transfer and mark locations of existing antennas prior to repainting. <br />•Modify holes from contact door switches on curbside passage door before repainting. <br />2.02X MODULE MODIFICATIONS <br />Modify curbside passage door frame to accommodate conversion from a sliding door to a <br />standard hinged door. <br />Modify Cabinet #14 door to accommodate a new twist slam latch. <br />2.08 EXTERIOR COMPARTMENTS <br />COMPARTMENT #1 Inside/Outside Access <br />Location:Streetside, forward <br />Transfer the following existing items: <br />•One 120 VAC GFCI duplex receptacle (Section 6.21 related) <br />•Two LED strip lights (Section 6.26 related) <br />•One adjustable shelf <br />•One MSA TIC charging base <br />Changes: <br />•Remove Rom door mounting hardware. Fill in holes and repaint compartment (Section <br />3.06 related) <br />•Install a new 120 VAC power box (Section 6.21 related). <br />COMPARTMENT #2 <br />Location: Streetside, aft <br />Transfer the following existing items: <br />•Four SCBA brackets (Section 4.10 related) <br />•One fire extinguisher mounting bracket (Section 4.32 related) <br />•Two LED strip lights (Section 6.26 related) <br />•Two adjustable shelves <br />Changes: <br />•Install a new 12″ yellow powder coated horizontal grab bar on the bottom of the upper <br />shelf. (Section 4.21 related).