My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Braun Northwest, Inc. 5/18/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Braun Northwest, Inc. 5/18/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 12:36:03 PM
Creation date
5/22/2025 12:33:51 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Braun Northwest, Inc.
Approval Date
5/18/2025
End Date
12/31/2025
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Refurbished 2016 North Star Vehicle
Tracking Number
0004841
Total Compensation
$191,550.21
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Previous build #2205-3 <br />BraunNW (jg/jw) 8 of 34 Everett Fire Dept. <br />5-5-25 Original build #/2205-3 Remount Specification <br />COMPARTMENT #3 <br />Location: Curbside, aft <br />Transfer the following existing items: <br />•One oxygen cylinder bracket and straps (Section 4.10 related) <br />•Stairchair boot bracket with strap (Section 4.27 related) <br />•Two LED strip lights (Section 6.26 related) <br />•One bin shelf <br />•Two backboard restraining straps <br />•One ″ J″ hook <br />Changes: None <br />COMPARTMENT #4 Inside/Outside Access <br />Location:Curbside, forward <br />Transfer the following existing items: <br />•Two LED strip lights (Section 6.26 related) <br />Changes: <br />•Transfer two existing batteries to the used chassis, one under hood and one shipped <br />loose (Sections 6.24 and 8.03 related). <br />•Transfer existing charging relay. <br />•Transfer exsisting battery tray (Section 6.24 related) <br />•Install two aftermarket Odyssey Group 31 AGM batteries on exsisting battery tray <br />(Section 6.24 related). <br />2.09X MODULE DOORS <br />Transfer all existing doors except curbside passage door. <br />Remove and discard existing curbside sliding passage door. <br />Rebuild door frame before painting to accommodate for new forward hinged curbside <br />passage door. <br />Install one box-pan-formed forward hinged curbside passage door with a total thickness of <br />2″. <br />2.09.01A DOOR SEAL <br />Remove and discard all existing door gaskets. <br />Install new door gaskets on all doors. Install a new stainless steel gasket protector in <br />Compartment #2. <br />2.09.02X DOOR HINGES <br />Transfer all existing hinges. <br />Remove and discard cusbside passage door track system. <br />Install new hinge on curbside passage door. <br />2.09.03X DOOR LATCHES <br />Transfer, lubricate, and adjust all existing compartment and passage door latches, except <br />for Compartment #2 and curbside passage door, for proper operation. <br />Install new Eberhard E-Grabber door handles and hardware on Compartment #2 doors and <br />new curbside passage door. <br />Install new emergency release levers on rear passage doors., one at the top and bottom of <br />each door.
The URL can be used to link to this page
Your browser does not support the video tag.