Laserfiche WebLink
II. Electronic Discharge Monitoring Reporting <br /> You must submit monthly discharge monitoring reports using Ecology's Electronic Discharge Monitoring Reporting <br /> (WQWebDMR) system. To sign up for WQWebDMR, or to register a new site, go to ecology.wa.gov/Regulations- <br /> Permits/Permits-certifications/Stormwater-general-permits, and click on the "Construction Stormwater" link. You will find <br /> information on WQWebDMR under the "WQWebDMR and PARIS" link on the right-hand side. If you are unable to submit <br /> your DMRs electronically, you may contact Ecology to request a waiver. Ecology will generally only grant waiver requests <br /> to those permittees without internet access. Only a permittee or representative, designated in writing, may request <br /> access to or a waiver from WQWebDMR. To have the ability to use the system immediately,you must submit the <br /> Electronic Signature Agreement with your application. If you have questions on this process, contact Ecology's <br /> WQWebDMR staff at WQWebPortal@ecy.wa.gov or 360-407-7097. <br /> III. Site Information <br /> Site Project Name: Eclipse Mill Park <br /> Street Address or Location Description: The Project would occur at the Eclipse Mill Park site, located at 3535 <br /> Riverfront Drive. The site is located on the west bank of the Snohomish River <br /> immediately adjacent to and northeast of the intersection of 36th Street and <br /> Riverfront Boulevard. <br /> City: Everett County: Snohomish Zip Code: 98201 <br /> Latitude: 47.97078 - Longitude: -122.188922 <br /> Type of Construction Activity: Site Acreage <br /> Residential Total site/project size: 3.7 acres <br /> Commercial Total disturbed area: 1.03 acres <br /> ElIndustrial Total area of soil disturbance for your site/project over the life of <br /> the project.Include grading,equipment staging,excavation, <br /> Highway or Road (city, county, state) borrow pit,material storage areas,dump areas,haul roads,side- <br /> cast areas,off-site construction support areas,and all other soil <br /> Utilities (specify): disturbance acreage associated with the project. <br /> �X Other(specify): Public Park <br /> Will 1,000 cubic yards or more of poured concrete or recycled concrete be used over the ❑Yes No <br /> life of the project? <br /> Estimated project start date: 7/1/2025 Estimated project completion date: 6/30/2026 <br /> Other Permits <br /> None <br /> IV. Existing Site Conditions <br /> 1.Are you aware of contaminated soils on this site? X Yes ❑No <br /> 2.Are you aware of groundwater contamination located within the site boundary? El Yes Ei No <br /> 3. If you answered yes to question 1 or 2,will any contaminated soils be distrubed or will any ❑X Yes ❑No <br /> contaminated groundwater be discharged due to the proposed construction activity? <br /> If yes, please provide detailed information (as known and readily available)on the nature and extent of the contamination <br /> (concentrations, locations, and depth) as well as pollution prevention and/or treatment Best Management Practices <br /> (BMPs) proposed to control the discharge of soil and/or groundwater contaminants in stormwater. This should include <br /> information that would be included in related portions of the Stormwater Pollution Prevention Plan (SWPPP)that describe <br /> how contaminated and potentially contaminated construction stormwater and dewatering water will be managed.You <br /> may attach this information separately, if needed <br /> V. Stormwater Pollution Prevention Plan (SWPPP) <br /> Page 2 of 4 <br />