Laserfiche WebLink
You must develop a SWPPP prior to starting construction. Do not submit your SWPPP with your application. If you <br /> answered yes to the questions in Part IV, please submit the information that would be included in related portions of the <br /> SWPPP that describe how contaminated and potentially contaminated construction stormwater and dewatering water will <br /> be managed. <br /> VI. Best Management Practices (BMPs) <br /> You must use the BMPs listed in the Stormwater Management Manual for Western Washington or the Stormwater <br /> Management Manual for Eastern Washington or other manuals approved by Ecology. Alternatively, you may use <br /> demonstrably equivalent BMPs on the basis of permit condition S9.C.4. If you intend to use a BMP at your site that is not <br /> included in these manuals, but that you believe meets the definition of a demonstrably equivalent BMP, you must notify <br /> the appropriate regional office. (See Definitions in the Construction Stormwater General Permit).* <br /> http://ecology.wa.gov/Regulations-Permits/Permits-certifications/Stormwater-general-permits/Construction-stormwater- <br /> permit#contacts <br /> *Note that if you receive permit coverage without indicating the preference for a demonstrably equivalent BMP and later decide to use one,you must <br /> provide Ecology with notice of the selection of an equivalent BMP no less than 60 days before the intended use of the equivalent BMP. <br /> VII. Discharge/Receiving Water Information <br /> If your project includes dewatering, you must include dewatering plans and discharge locations in your site Stormwater <br /> Pollution Prevention Plan. <br /> Location of Discharge into Surface Waterbody <br /> Outfall Outfall Description Surface Waterbody Outfall Type Latitude Longitude <br /> Number <br /> 1 Streambank Snohomish River Surface Water Body 47.970802 -122.188749 <br /> VIII. State Environmental Policy Act(SEPA) <br /> This Notice of Intent(NOI) is incomplete and cannot be approved until the applicable SEPA requirements under Chapter <br /> 197-11 WAC are met. <br /> Who is the SEPA lead agency on your site? City of Everett <br /> Has the SEPA lead agency issued a final decision on your checklist? ❑X Yes No EiExempt <br /> If No: The NOI is incomplete. Ecology will hold the application until a final SEPA decision is made or the <br /> Construction Stormwater NOI public comment period ends,whichever is later. You must notify Ecology once the <br /> lead agency has issued a determination. <br /> If Yes: Type of SEPA decision issued: OTHER <br /> Date of final SEPA decision: 2/24/2010 <br /> Date when all SEPA-related comment&appeal periods ended or will end: 2/8/2010 <br /> If Exempt: <br /> 11 Watershed Restoration & Fish Habitat Enhancement Exemption (RCW 43.21C.0382). <br /> Infill Development Exemption (RCW 43.21 C.229). <br /> Planned Action Exemption (RCW 43.21C.031). <br /> Categorical Exemption. Under what section of the SEPA Rule(WAC 197-11-800) is it exempt? <br /> Section: <br /> IX. Public Notice <br /> You must publish a public notice at least once a week for two consecutive weeks with seven days between <br /> publications, in at least a single newspaper of general circulation in the county in which the facility is located. Ecology <br /> cannot grant permit coverage sooner than the end of the 30-day public comment period,which begins on the date of the <br /> second public notice. <br /> Page 3 of 4 <br />