My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/05/21 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/05/21 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 3:19:54 PM
Creation date
5/23/2025 3:17:59 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
5/21/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />27 (2) The funding appropriated under this section must be combined <br />28 with local funds <br /> <br />29 (3) The department may not expend funding for a project in this <br />30 section unless and until the nonstate share of that project's costs <br />31 have been either expended or firmly committed, or both, in an amount <br />32 sufficient to complete the project or a distinct phase of the <br />33 project. This requirement does not apply to projects where a share of <br />34 the appropriation is for design costs only. <br /> <br />The Youth athletic facility account is inappropriately paying for MLB, MiLB, and MLBPA design costs. <br /> <br />35 (4) Prior to receiving funding, grant recipients must demonstrate <br />36 that the project site is under control for a minimum of 10 years, <br />37 either through ownership or a longāterm lease. This requirement does <br /> <br />p. 59 ESSB 5200.PL <br /> <br /> <br />1 not apply to grants for preconstruction activities or grants in which <br />2 the sole purpose is to purchase real property that does not include a <br />3 construction or renovation component. <br /> <br />The Youth athletic facility account is inappropriately paying for MLB, MiLB, and MLBPA pre construction activities. <br /> <br />The "New Stadium" project site is currently clearly not under control for a minimum of 10 years, either through <br />ownership or a long term lease. <br /> <br />4 (5) In contracts for grants authorized under this section, the <br />5 department must include provisions that require that capital <br />6 improvements be held by the grantee for a specified period of time <br />7 appropriate to the amount of the grant and that facilities be used <br />8 for the express purpose of the grant. If the department finds the <br />9 grantee to be out of compliance with provisions of the contract, the <br />10 grantee shall repay to the state general fund the principal amount of <br />11 the grant plus interest calculated at the rate of interest on state <br />12 of Washington general obligation bonds issued most closely to the <br />13 date of authorization of the grant. <br /> <br />The Youth athletic facility account is inappropriately paying for MLB, MiLB, and MLBPA design costs, pre construction <br />activities, and costs that are not for the express purpose of the Everett School District: Everett Memorial Stadium grant. <br /> <br />The $7.4 million grant for the Everett School District: Everett Memorial Stadium should be returned to the Youth athletic <br />facility account. <br /> <br />RCW 43.99N.060 reads: <br /> <br />"(3)(c) The balance, if any, shall be transferred to the youth athletic facility account under subsection (4) of this section. <br /> <br />(4) Any moneys in the stadium and exhibition center account not required or permitted to be used for the purposes <br />described in subsection (3)(a) and (b) of this section shall be deposited in the youth athletic facility account hereby
The URL can be used to link to this page
Your browser does not support the video tag.