Laserfiche WebLink
CITY OF EVERETT <br />EVERETT Permit Services <br />WASHINGTON <br />MEMORANDUM <br />TO: BUSTARD CUSTOM CONST INCH bustardcustomconstruction@gmail.com <br />FROM: Abiy Tsegaye I City of Everett Engineering/Permit Services, ATsegave@everettwa.gov <br />DATE: 11/07/2023 <br />SUBJECT: Plan Review Comments for Public Works Permit Application <br />PROPOSAL: New Single -Family Residence <br />LOCATION: 9530 Holly Dr <br />PERMIT #: B2310-106;B2310-108;B2310-110;B2310-112;B2310-113;B2310-114 <br />A review of this project by the Engineering/Permit Services Division indicates that the following revisions should be made and/or the following conditions <br />must be met: <br />Please see the compiled list of comments below to revise your plans accordingly, prior to resubmitting to Permit Services. Please respond to comments in <br />the table's response column provided. If you have any questions regarding the comments or need anything further, please directly contact this project's <br />Public Works reviewer, Abiy Tsegaye, at ATsegaye@everettwa.gov. Please note that these comments are compiled from Public Works reviewers for the <br />Public Works (civil) plans only. The applicant team may receive a separate comment letter from the Planning Reviewer for comments related to this <br />construction permit or the associated ongoing Land Use review, or from the Building Reviewer for architectural, structural, or other types of drawings. <br />Resubmittal: Please follow the instruction in Permit-Apalication-Submittal-Re-submittal-Instructions <br />Required resubmittal items are as outlined below: <br />i. Plans: Revised Civil Plans- civil site plans responding to these comments. <br />ii. SWPPP: SWPPP report —Refer to approved drainage report <br />iii. Drainage Report: See comment Line 2 <br />