My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans Associates 5/28/2025 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans Associates 5/28/2025 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:38:01 PM
Creation date
5/29/2025 12:37:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans Associates
Approval Date
5/28/2025
Council Approval Date
3/12/2025
End Date
12/31/2025
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Structural On-Call Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003494
Total Compensation
$120,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
TranTech Engineering LLC 9/6/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />AMENDED EXHIBIT A - CITY OF EVERETT ENGINEERING <br />SUPPORT ON-CALL SERVICES <br />INTRODUCTION <br />The City of Everett (City) has requested an engineering services proposal from TranTech <br />Engineering LLC, (DBA David Evans and Associates Engineering,- DEA) to provide bridge <br />load rating, miscellaneous engineering support and funding to support on-call services. <br />All work shall be in accordance with City, WSDOT, and FHWA guidelines and with the <br />requirements of the National Bridge Inspection Standards (NBIS), where applicable. <br />Throughout this proposed work, there will be close coordination between DEA and the City. <br />DEA will manage the proposed activities to ensure timeliness of required submittals within <br />FHWA and WSDOT timeline requirements. DEA will also provide bridge program liaison <br />support with those agencies. <br />Details of the necessary amended tasks associated with the proposed work are described in <br />further detail in the following sections. <br />Task 2 – Scour Evaluations <br />DEA shall provide scour evaluations per WSDOT Bridge Scour Evaluation Form for uploading <br />into WSDOT Bridge Works for up to 6 City Bridges. <br />Assumptions <br />The activities in this task is limited to structures that their scour stability can be determined via <br />the WSDOT Bridge Scour Evaluation Form. <br />Budget <br />The amended budget for this task is estimated at $20,000 as provided in Exhibit B – <br />Compensation per Hourly Rate to a Maximum Amount (see original contract).
The URL can be used to link to this page
Your browser does not support the video tag.