My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Evans Associates 5/28/2025 Amendment 2
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
David Evans Associates 5/28/2025 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2025 12:38:01 PM
Creation date
5/29/2025 12:37:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Evans Associates
Approval Date
5/28/2025
Council Approval Date
3/12/2025
End Date
12/31/2025
Department
Public Works
Department Project Manager
Dan Enrico
Subject / Project Title
Structural On-Call Support
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0003494
Total Compensation
$120,000.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
TranTech Engineering LLC 9/6/2022
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Task 6 – Miscellaneous Engineering Support <br />DEA shall provide miscellaneous engineering support under the direction of the City’s Project <br />Manager. Anticipated work might include tasks associated with bridge maintenance such as <br />emergency repairs and site visits. Other tasks might include inspection, design, economic <br />analysis, studies and reports, general engineering and structural engineering support for City’s <br />various transportation infrastructure as needed and identified by the City. <br />Budget <br />The amended budget for this task is estimated at $160,043 as provided in Exhibit B – <br />Compensation per Hourly Rate to a Maximum Amount (see original contract). <br />Summary <br />Task No. Original Amount Amended Amount Increase <br />Task 2 $5,000 $20,000 $15,000 <br />Task 6 $55,043 $160,043 $105,000 <br /> Total Increase $120,000
The URL can be used to link to this page
Your browser does not support the video tag.