My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W ZAP ENERGY 2025-08-04
>
Address Records
>
23RD DR W
>
5901
>
ZAP ENERGY
>
5901 23RD DR W ZAP ENERGY 2025-08-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 11:31:43 AM
Creation date
5/30/2025 8:11:21 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZAP ENERGY <br /> ppp— <br /> Date: 11/13/24 <br /> Site Address: 5901 23rd Dr W Suite 100 <br /> Permit Number: B2410-026 <br /> Re: Itemized Response Letter to First Review Corrections <br /> General Comments <br /> 1. See attached 2nd Review—Architectural Sheets 11.13.2024 for the architectural plan <br /> set including site plan, floor plans, means of egress, and demolition plan. Fire <br /> protection drawings were originally submitted separately but have been included <br /> here attached as 1st Review_Zap Total Fire Plan. <br /> 2. Demolition Plan is part of the architectural plan referenced above on sheet A2.1. <br /> Architectural Comments <br /> 1. To address this comment, the following items area attached: <br /> a. Hazardous Materials Plan: 2nd Review_HazardousMaterials Report_11.13.24 <br /> b. Business License for Zap showing classification of particle accelerator:WA <br /> DOR - Particle Accelerator License. <br /> c. Original(existing) shielding wall analysis: Shielding Plan for Everlab Facility <br /> 2. Full height section of the building has been included in the architectural plan set on <br /> page A.21, detail 1. <br /> Structural Comments <br /> 1. Updated building structural plans are attached titled 2nd Review_Building <br /> Plans 11.13.24 that includes a note on S-100 to reference the section 10/200. <br /> 2. Calculation updates provided in attachment <br /> 2ndReview SturcturalCalculations 11.13.2024. <br />
The URL can be used to link to this page
Your browser does not support the video tag.