My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5901 23RD DR W ZAP ENERGY 2025-08-04
>
Address Records
>
23RD DR W
>
5901
>
ZAP ENERGY
>
5901 23RD DR W ZAP ENERGY 2025-08-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2025 11:31:43 AM
Creation date
5/30/2025 8:11:21 AM
Metadata
Fields
Template:
Address Document
Street Name
23RD DR W
Street Number
5901
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZAP ENERGY <br /> ZRD-SPL-001 <br /> Table A.Physical locations of the area monitors and the beginning quarters of the monitoring. <br /> Area Monitor ID Physical Location Monitoring <br /> Begin <br /> Control RSO's office 2022 Q1 <br /> 1 Right under FuZE-Q 2022 Q1 <br /> 2 External side of the FuZE-Q Southwest shielding wall 2022 Q1 <br /> 3 Optics enclosure—South to FuZE 2022 Q1 <br /> 4 Outside the HV Lab 2022 Q1 <br /> 5 Outside the Control Room 2022 Q1 <br /> 6 Suite 100 office 2022 Q1 <br /> 7 Neutronics room door 2022 Q1 <br /> 8 Southwest side of the lab space 2022 Q1 <br /> 9 Next to the garage door between Suites 100 and 101 2022 Q1 <br /> 10 Right under FuZE 2022 Q1 <br /> 11 Next to the Bay Door 1 2022 Q1 <br /> 12 South side of the Bank B conex 2022 Q1 <br /> 13 Room next to the source storage location 2022 Q4 <br /> 14 Bank A enclosure North wall 2023 Q4 <br /> 15 Bank A enclosure South wall 2023 Q4 <br /> 16 Under FuZE-Q(on the downstream supporting beam) 2024 Q2 <br /> 17 Next to#10 but set up vertically 2024 Q1 <br /> 18 FuZE-Q vent on the roof 2024 Q2 <br /> 19 FuZE vent on the roof 2024 Q2 <br /> 20 On the Bay Door 1 2024 Q2 <br /> 21 On the Ramp Door 1 2024 Q2 <br /> 22 External wall of the building close to the Bank B 2024 Q2 <br /> 23 External wall of the building close to FuZE-Q 2024 Q2 <br /> 24 East Emergency Exit Door 2024 Q2 <br /> 25 On the South wall of the Southwest corner of the FuZE-Q 2024 Q2 <br /> shielding (inside) <br /> 26 Northwest exit of the FuZE-Q shielding enclosure (on the 2024 Q2 <br /> FuZE bank wall) <br /> 27 West side of the Bank A enclosure 2024 Q2 <br /> 28 HV Lab emergency exit 2024 Q2 <br /> 29 Control Room entrance from the office 2024 Q2 <br /> Signature: Signature: <br /> Email: pi-en@zap.energy Email: blevitt@zapenergyinc.com <br /> Zap Energy Inc. Proprietary Information <br /> A-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.