Laserfiche WebLink
Zap Shielding Plan for EverLab Facility (Rev 0) <br /> Final Audit Report 2024-06-27 <br /> Created: 2024-06-27 <br /> By: Don Gregoire(don.gregoire@zap.energy) <br /> Status: Signed <br /> Transaction ID: CBJCHBCAABAAcflpNwYNB6_i1GFThKkuDNNAzpASTHT_ <br /> "Zap Shielding Plan for EverLab Facility (Rev 0)" History <br /> Document created by Don Gregoire (don.gregoire@zap.energy) <br /> 2024-06-27-5:35:59 PM GMT <br /> y Document emailed to Pi-En Tsai (pi-en@zap.energy)for signature <br /> 2024-06-27-5:36:14 PM GMT <br /> Document emailed to Ben Levitt(blevitt@zapenergyinc.com) for signature <br /> 2024-06-27-5:36:14 PM GMT <br /> Email viewed by Ben Levitt (blevitt@zapenergyinc.com) <br /> 2024-06-27-5:45:56 PM GMT <br /> Document e-signed by Ben Levitt (blevitt@zapenergyinc.com) <br /> Signature Date:2024-06-27-5:46:19 PM GMT-Time Source:server <br /> Email viewed by Pi-En Tsai (pi-en@zap.energy) <br /> 2024-06-27-5:49:28 PM GMT <br /> Document e-signed by Pi-En Tsai (pi-en@zap.energy) <br /> Signature Date:2024-06-27-6:00:32 PM GMT-Time Source:server <br /> Agreement completed. <br /> 2024-06-27-6:00:32 PM GMT <br /> Q Adobe Acrobat Sign <br />