My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3927 RUCKER AVE BASE FILE 2025-07-21
>
Address Records
>
RUCKER AVE
>
3927
>
BASE FILE
>
3927 RUCKER AVE BASE FILE 2025-07-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2025 9:10:07 AM
Creation date
5/30/2025 8:11:26 AM
Metadata
Fields
Template:
Address Document
Street Name
RUCKER AVE
Street Number
3927
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STRUCTURAL STEEL OBSERVATIONS REPORT Terracon <br />Report Number: M7241892.0001 <br />Service Date: 12/06/24 20225 Cedar Valley Rd Ste 110 <br />Report Date: 12/20/24 Lynnwood, WA 98036-6365 <br />Task: Inspection Services 425-742-9360 <br />Client Project <br />MacDonald -Miller Facility Solutions Inc TEC Gunderson Humidifier Replace <br />Attn: Ryan Miller 3927 Rucker Ave <br />17930 International Blvd, Suite 120 Everett, WA 98201 <br />Seatac, WA 98188 <br />Project Number: M7241892 <br />Permit No: M2409-076 <br />GENERAL INFORMATION <br />On site for structural steel welding inspection in accordance with AWS D 1.1 specs and project plans. Inspected HSS tube <br />steel framing located between C.5-D.8/3 line per drawing S1 dated 10-30-24. Verified welder Jeremiah Hay has a current <br />welding certificate. Welding found acceptable to code. Several welds are not yet completed due to the positioning of <br />equipment for final installation. Welds that will be covered by equipment are complete and acceptable to code. <br />COMPLIANCE STATEMENT <br />Preliminary Observation(s) <br />The remaining welds need to be inspected after the final installation <br />Services: Special Inspections / Materials Testing <br />Terracon Rep.: Mark Vassallo <br />Reported To: <br />Contractor: MacDonald -Miller Facility Solutions <br />Report Distribution: <br />(1) MacDonald -Miller Facility Solutions (1) Terracon Consultants, Inc., Gale <br />Inc. Rvan Miller Noves <br />(1) Terracon Consultants, Inc., Michael <br />Mattox <br />Reviewed By: �e D <br />Michael Mattox <br />Senior Project Field Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client <br />indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br />the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />CT0001, 10-16-13, Rev.10 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.