Laserfiche WebLink
STRUCTURAL STEEL OBSERVATIONS REPORT Terracon <br />Report M7241892.0001 <br />Service Date: 12/06/24 20225 Cedar Valley Rd Ste 110 <br />Report Date: 12/20/24 Lynnwood, WA 98036-6365 <br />Task: Inspection Services 425-742-9360 <br />Client Project <br />MacDonald -Miller Facility Solutions Inc TEC Gunderson Humidifier Replace <br />Attn: Ryan Miller 3927 Rucker Ave <br />17930 International Blvd, Suite 120 Everett, WA 98201 <br />Seatac, WA 98188 <br />Project M7241892 <br />r <br />Jo� <br />Overall framing roof elevation <br />Close up of welding <br />Services: Special Inspections / Materials Testing <br />Terracon Rep.: Mark Vassallo <br />Reported To: <br />Contractor: MacDonald -Miller Facility Solutions <br />Report Distribution: <br />(1) MacDonald -Miller Facility Solutions (1) Terracon Consultants, Inc. <br />Inc. Rvan Miller Noves <br />(1) Terracon Consultants, Inc., <br />Michael Mattox <br />Gale <br />Reviewed By: <br />Michael Mattox <br />Senior Project Field Manager <br />The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client <br />indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br />the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br />CT0001, 6-30-11, Rev.9 Page 1 of 1 <br />