Laserfiche WebLink
Describe drainage flow paths (direction, location): <br />Site drains to the south, roof drainage via downspout splash blocks. Existing street <br />drains to the west. <br />Are there Critical Areas? What are they and where are they located relative to your project?: <br />No critical Areas at all. <br />(D Task 2: Describe proposed project <br />Describe your proposed project: <br />Remove existing house, detached garage, driveway and walks. Construct new house <br />with attached garage and new driveway and walks. <br />How will your project change the existing condition?: <br />No change to existing condition. <br />Describe roofs, patios, driveways, or structures added: <br />New roofs, drainage and walkway similar to existing asphalt shake roof, concrete <br />driveway and walks. <br />How will stormwater be managed?: <br />Roof runoff to be managed using a perforated stub out connection per BMP T5.10C. <br />Other hard surfaces with sheet flow to the city storm catch basin along Tamarack Ave. <br />Describe how the project will affect existing drainage systems onsite or on adjacent properties <br />or both: <br />Existing downspout splash block will be removed with the existing house. Proposed <br />house will utilize a perforated stub out connection per BMP T5.10C. <br />Existing other hard surfaces sheet flow to city storm catch basin along Tamarack Ave. <br />Proposed other hard surfaces are proposing to do the same. <br />City of Everett Public Works <br />Small Project Stormwater Site Plan Report -Dec 2019 <br />