Laserfiche WebLink
MacDonald -Miller <br />FACILITY SOLUTIONS <br />Energy Recovery Unit <br />PROJECT: TERRAPWR <br />LOCATION: Everett, WA <br />PROJECT #: 7224-7206 <br />SYSTEM/UNIT: Existing DOAS-01 <br />Unit Manufacturer Ref Only <br />Existing DOAS-01 Supply Outlet Summary <br />DATE: 11 /20/2024 <br />CONTACT: Brad Sharp <br />Existing DOAS-01/Exhaust Fan <br />Motor Hertz 60 Hz <br />Existing DOAS-01/Supply Fan <br />Motor Hertz 60 Hz <br />System/Unit' <br />a of Out <br />_V <br />Design Prelim <br />ctor Reading Reading <br />= Final °=■ <br />Reading <br />I! Totals: <br />40 392A-EL45 <br />_A <br />--I <br />Existing DOAS-01 Return Inlet Summary <br />�System/Uni <br />-�-� <br />Readin IIIIIIIIIIIIIIIIIIIIIIlTlet'_- <br />g ype <br />Design Reading el Final <br />r ReadingReadin Prelim Reading <br />100 190 190 110 -� <br />MacDonald -Miller Page 2 of 8 <br />