My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2707 VICTOR PL 2025-10-24
>
Address Records
>
VICTOR PL
>
2707
>
2707 VICTOR PL 2025-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 11:04:12 AM
Creation date
5/30/2025 2:10:39 PM
Metadata
Fields
Template:
Address Document
Street Name
VICTOR PL
Street Number
2707
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: B2310-022 <br />Applied: 10/7/2023 <br />Issued:6/18/2024 <br />Status: PERMIT ISSUED <br />Parent Permit: W2306-009 <br />Parent Project: <br />Details: <br />STORAGE UPSTAIRS AREA <br />Permit Inspections <br />City of Everett <br />Approved:6/17/2024 <br />Finaled: <br />Description: ADD WALLS ON MAIN FLOOR/ MODIFY ACCESS STAIRS TO <br />(W2306-009) <br />Site Address: 2707 VICTOR PL <br />City, State Zip Code: EVERETT, WA 98201-2560 <br />Applicant: DOUG STEINER <br />Owner: 2707 VICTOR PLACE LLC <br />Contractor: OWNER <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />BLDG 16-FINAL <br />BLDG INSPECTOR <br />eTRAKiT Inspection Request <br />Notes: <br />11/5/2024 6:57 PM Refugio Camilo <br />Contact Name: Refugio Camilo <br />Site Address: 2707 VICTOR PL <br />Phone:4259489487 <br />e-Mail: info@dreconstruction.net <br />8/28/2024 <br />8/28/2024 <br />BLDG 01- <br />RAKEEB KHAN <br />OTHER <br />STAIRS <br />CONSULTATION <br />Notes: <br />425-948-9487 <br />info@dreconstruction.net <br />Need mechanical permit for new kitchen exhaust. Need all rough in approvals prior to framing inspection. Discussed stair requirements as shown per <br />plan. <br />10/3/2024 <br />10/3/2024 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />CORRECTION <br />REQUIRED <br />Notes: <br />Need all sub permit rough in approval. Contractor is adding additional vent holes in blocking at eaves. Reschedule when ready. <br />10/10/2024 <br />10/10/2024 <br />BLDG 08-FRAMING <br />I RAKEEB KHAN <br />I APPROVAL <br />see notes <br />Notes: <br />10/9/2024 4:00 PM Refugio Camilo <br />Contact Name: Refugio Camilo <br />Site Address: 2707 VICTOR PL <br />Phone:4259489487 <br />e-Mail: info@dreconstruction.net <br />rfk changed Inspection Type from BLDG 16-FINAL to BLDG 08-FRAMING <br />Ok to insulate walls where exposed, drywall, mud and tape. Schedule final when ready. <br />I <br />Printed: Thursday, 14 November, 2024 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.