My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1111 WETMORE AVE B 2025-06-24
>
Address Records
>
WETMORE AVE
>
1111
>
1111 WETMORE AVE B 2025-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2025 1:44:29 PM
Creation date
5/30/2025 2:11:07 PM
Metadata
Fields
Template:
Address Document
Street Name
WETMORE AVE
Street Number
1111
Unit
B
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> EVERETT Public Works Department <br /> WASHINGTON <br /> Date: January 10, 2024 <br /> Owner: HENRY KIMSON/TAFARI-HENRY JANINE MARIE <br /> Job Address: 1111 Wetmore Ave <br /> Plan Check No: B2311-004 <br /> Email Address: Janinetafari@gmail.com <br /> RE: Building Submission Intake Letter <br /> Dear Mr. & Mrs. Henry, <br /> In response to the application for a building permit for the Proposed attached A.D.U., the plans have <br /> been examined and you are advised that revisions are required before a review may begin. Please <br /> review and respond to the comments below. <br /> A. General Requirements <br /> 1. General: <br /> a. Two complete sets of construction drawings. See IRC Section R106.1(WAC). Do not submit <br /> original copies; originals will not be returned. Sets should include at a minimum (as applicable): <br /> i. Site <br /> ii. Architectural <br /> iii. Structural <br /> b. Provide a scope of work (SOW) statement describing the proposed project (IRC Section <br /> R105.3(1)). List key project elements. Proposed future work should not be included. <br /> c. List work requiring separate permits including but are not limited to: electrical, mechanical, <br /> plumbing. <br /> 2. Building Drawings: <br /> a. Architectural and structural construction. Provide separate drawings for each discipline where <br /> work is significant. Proposed future work should not be included. See specific requirements in <br /> "Architectural"and Structural"sections below. <br /> b. Show entire house layout, including existing construction not included in the project. Detailed <br /> construction information is not required for existing work that has been previously permitted. <br /> Existing construction should show: <br /> i. Walls, drawn at nominal thicknesses (e.g., 4", 6", etc.). <br /> ii. Stairs, including width, handrails, and landings (dimension size). <br /> iii. Doors, type, width, and swing direction. <br /> iv. Windows, including emergency egress windows and sizes. <br /> v. Non-habitable spaces (e.g., garages, unfinished basements, attics, crawls spaces, <br /> storage rooms, etc.) <br /> vi. Label use of each room (e.g., kitchen, bedroom, etc.). <br /> vii. Exterior decks, porches, and balconies, including stairs, guards, and landings. <br /> viii. Locations of all appliances (e.g., stove, furnace, W/D, etc.). <br /> 3200 Cedar Street © 425.257.8810 O PermitServices@everettwa.gov <br /> Everett,WA 98201 everettwa.gov/permits <br />
The URL can be used to link to this page
Your browser does not support the video tag.