Laserfiche WebLink
Stormwater Pollution Prevention Plan General Introduction <br /> and the Stormwater Management Manual for Western Washington(SWMMWW 2019). The <br /> report is divided into seven main sections with several appendices that include stormwater <br /> related reference materials. The topics presented in the each of the main sections are: <br /> ■ Section 1 —INTRODUCTION. This section provides a summary description <br /> of the project and the organization of the SWPPP document. One general <br /> introduction is used for the entire project. All subsequent sections are <br /> included in each part defined previously. <br /> ■ Section 2—SITE DESCRIPTION. This section provides a detailed <br /> description of the existing site conditions, proposed construction activities, <br /> and calculated stormwater flow rates for existing conditions and post— <br /> construction conditions. <br /> ■ Section 3 —CONSTRUCTION BMPs. This section provides a detailed <br /> description of the BMPs to be implemented based on the 13 required <br /> elements of the SWPPP. <br /> ■ Section 4—CONSTRUCTION PHASING AND BMP <br /> IMPLEMENTATION. This section provides a description of the timing of <br /> the BMP implementation in relation to the project schedule. <br /> ■ Section 5—POLLUTION PREVENTION TEAM. This section identifies the <br /> appropriate contact names (emergency and non-emergency), monitoring <br /> personnel, and the onsite temporary erosion and sedimentation control <br /> inspector. <br /> ■ Section 6—INSPECTION AND MONITORING. This section provides a <br /> description of the inspection and monitoring requirements such as the <br /> parameters of concern to be monitored, sample locations, sample frequencies, <br /> and sampling methods for all stormwater discharge locations from the site. <br /> ■ Section 7—RECORDKEEPING. This section describes the requirements for <br /> documentation of the BMP implementation, site inspections, monitoring <br /> results, and changes to the implementation of certain BMPs due to site <br /> factors experienced during construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A—Vicinity Map, Soil Map, TESC Drawings <br /> Appendix B—Construction BMPs <br /> Appendix C—Alternative Construction BMP list <br /> Appendix D—DOE General Permit <br /> Appendix E—Site Log and Inspection Forms <br /> SNBL USA, LTD—Seaway Commercial Center <br /> SWPPP 2 August, 2022 <br />