Laserfiche WebLink
STA' <br /> c z <br /> �F. v <br /> oy <br /> STATE OF WASHINGTON <br /> DEPARTMENT OF ECOLOGY <br /> PO Box 47600, Olympia, WA 98504-7600 • 360-407-6000 <br /> August 5, 2022 <br /> Steven Meyer <br /> 6605 Merrill Creek Pkwy <br /> Everett, WA 98203 <br /> RE: Coverage under the Construction Stormwater General Permit <br /> Permit number: WAR311691 <br /> Site Name: Seaway Commercial Facility <br /> Location: 7007 Seaway Blvd <br /> Everett, WA County: Snohomish <br /> Disturbed Acres: 12.5 <br /> Dear Steven Meyer: <br /> The Washington State Department of Ecology (Ecology) received your Notice of Intent for <br /> coverage under Ecology's Construction Stormwater General Permit (CSWGP). This is your <br /> permit coverage letter. Your permit coverage is effective August 5, 2022. <br /> Retain this letter as an official record of permit coverage for your site. You may keep your <br /> records in electronic format if you can easily access them from your construction site. You can <br /> get the CSWGP, permit forms, and other information at Ecology's CSWGP eCoverage Packet <br /> webpagel. Contact your Permit Administrator, listed below, if you want a copy of the CSWGP <br /> mailed to you. Please read the permit and contact Ecology if you have any questions. <br /> Electronic Discharge Monitoring Reports (WQWebDMR) <br /> This permit requires you to submit monthly discharge monitoring reports (DMRs) for the full <br /> duration of permit coverage (from the first full month of coverage to termination). Your first <br /> sampling and reporting period will be for the month of September and your first DMR must be <br /> submitted by October 15, 2022. <br /> 1 http://www.ecology.wa.gov/eCoverage-packet <br />