Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Permit Services <br /> WASHINGTON <br /> September 5, 2024 <br /> Applicant: Carmelo N Laviste <br /> Owner: Shikesso Teshome A/Setegn Muluemebet <br /> Job Address: 8900 8TH AVE W <br /> Plan Check Number: B2408-012 <br /> 15t Building Review Letter <br /> Dear Carmelo, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes adopted <br /> and amended by the state of Washington and the City of Everett.The following comments are provided by <br /> the Building Plans Examiner and should be addressed before a permit can be issued.Additional comments <br /> may be issued separately by the Public Works, Planning, and Fire review disciplines. <br /> In order for the processing of your application to continue,the following documentation, shall be submitted <br /> to Permit Services for review: <br /> a. Itemized letter addressing the comments provided below in this correction letter. <br /> b. Complete set of revised construction drawings. <br /> c. Complete set of supplemental structural calculations (if applicable). <br /> Naming convention of the uploaded documents shall be as follows: <br /> 2ndReview_DocumentType_MM.DD.YYYY(e.g. 2ndReview_BuildingPlans_08.01.2023) <br /> Resubmittal Instructions: Please upload your revised documents through the Online Permitting Portal at <br /> https://onIinepermits.everettwa.gov/following the required standards and naming convention listed in <br /> the permit document upload standards& instructions (PDF). Once uploaded, you must send an email with <br /> your Transmittal Sheet (PDF) to PermitServices@everettwa.gov to ensure proper routing through the <br /> system, as the online permitting portal does not notify staff when documents are uploaded. Failure to do so <br /> will delay your permit review. Upon submittal of the revised documents, your application will be given <br /> priority and the review will recommence. <br /> Architectural: <br /> 1. It appears to be a drafting error that Tier 3 efficient water heater should be energy credit option 5.6. <br /> please revise accordingly. Sheet A2. <br /> 2. Please provide plan dimensions for the new ramp accordingly. Sheet A2. <br /> 3. Handrail note is hard to read, please revise accordingly(highlighted text). Sheet A3. <br /> Page 1 of 2 <br />