<br /> FIRE AUTHORITY NOTES FINISH NOTES FLOOR PLAN NOTES DEMOLITION NOTES DESIGN BUILD NOTES
<br /> r � o
<br /> rn o
<br /> 1. FINAL INSPECTION BY FIRE DEPARTMENT IS REQUIRED- SCHEDULE 72 HOURS IN o N d
<br /> ADVANCE. 1. NO FINISH SUBSTITUTIONS MAY BE MADE UNLESS APPROVED BY ARCHITECT. 1. CONTRACTOR AND ARCHITECT TO REVIEW&APPROVE CHALK LINES OF PARTITION 1. DRAWINGS OF EXISTING CONDITIONS HAVE BEEN COMPILED FROM EXISTING DATA 1. LIGHT SWITCHES SHALL BE INSTALLED AT+48"A.F.F. MULTIPLE SWITCHES z 3 N
<br /> LAYOUT PRIOR TO COMMENCEMENT OF PARTITION CONSTRUCTION. SUPPLIED BY THE OWNER TO THE ARCHITECT. THE ARCHITECT MAKES NO SHOULD BE GANGED TOGETHER UNLESS OTHERWISE SPECIFIED. m
<br /> 2. THE PROJECT ADDRESS SHALL BE PROVIDED FOR ALL NEW AND EXISTING 2. CONTRACTOR MUST NOTIFY THE ARCHITECT OF ANY DISCREPANCY IN PLANS. WARRANTY, EITHER EXPRESS OR IMPLIED, FOR THE ACCURACY OF THE
<br /> BUILDINGS IN A POSITION AS TO BE PLAINLY VISIBLE AND LEGIBLE FROM THE FINISH ITEMS CLEARLY SHOWN IN PLANS,BUT OMITTED FROM SCHEDULES OR 2. CONTRACTOR TO VERIFY DIMENSIONS FOR ALL PLUMBING PARTITION. COMP LETENESS OF THE EXISTING INFORMATION RECORDED. THE CONTRACTOR 2. CONTRACTOR TO VERIFY ALL SWITCH LOCATIONS NTH THE ARCHITECT PRIOR TO
<br /> STREET OR ROAD FRONTING THE PROPERTY PER LOCAL FIRE DEPARTMENT LEGENDS MUST STILL BE PROVIDED AND INSTALLED BY CONTRACTOR. SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND NOTIFY THE ARCHITECT INSTALLATION. NUMBER OF SWITCHES FOR OPEN AREA IS BIDDER DESIGN. O
<br /> STANDARDS. CONTRACTOR TO VERIFY OMITTED FINISHED WITH ARCHITECT PRIOR TO ORDERING 3. EXTEND ALL STUDS AND WALL MATERIALS TO CONSTRUCTION ABOVE,U.O.N. IMMEDIATELY OF ANY DISCREPANCIES OR CONFLICTS THAT MIGHT ARISE IN THE SWITCHES INDICATED ON THE DRAWINGS FOR OPEN AREA ARE FOR REFERENCE ti
<br /> PRODUCTS. COURSE OF THE DEMOLITION WORK. ONLY. o `�
<br /> 3. AN UNOBSTRUCTED ALL-WEATHER FIRE APPARATUS ACCESS ROAD SHALL BE IN 4. ALL CONDUIT PIPING IN ELECTRICAL ROOM TO BE CONCEALED WITHIN THE WALL V ,4Oy
<br /> PLACE PRIOR TO DELIVERY OF COMBUSTIBLE BUILDING MATERIALS TO THE SITE. 3. INSTALL MATERIALS ACCORDING TO MANUFACTURER'S SUGGESTED INSTALLATION CONSTRUCTION. 2. VERIFY LOCATIONS OF EXISTING MECHANICAL,PLUMBING AND ELECTRICAL 3. CONTRACTOR SHALL PROVIDE SEISMIC BRACING AT ALL NEW AND RELOCATED ? a
<br /> AND PREPARATION/MAINTENANCE SPECIFICATIONS OR BETTER,UNLESS OTHERWISE UTILITIES. LOCATE AND PROTECT UTILITIES TO REMAIN. DISCONNECT,REMOVE LIGHT FIXTURES. o
<br /> 4. FIRE PREVENTION WATER SERVICE SHALL BE IN SERVICE PRIOR TO DELIVERY OF APPROVED OR NOTED. 5. DOOR OPENINGS IN PARTITIONS NOT DIMENSIONED ARE TO BE LOCATED WITHIN BACK TO NEAREST JUNCTION BOX OR PANEL,AS REQUIRED, AND CAP
<br /> COMBUSTIBLE BUILDING MATERIALS TO THE SITE. 0'-4"OF ADJACENT PERPENDICULAR PARTITION. DESIGNATED UTILITIES WITHIN THE DEMOLITION AREA. REFER TO THE 4. CONTRACTOR SHALL VERIFY AND PROVIDE A COMPLETE HVAC SYSTEM WHICH o
<br /> 4. APPLICATION OF CONTROLLED INTERIOR FINISHES SHALL BE IN CONFORMANCE MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFO. CONFORMS TO THE OWNER'S HVAC SPECIFICATIONS.CONTRACTOR SHALL BE -
<br /> 5. ACCESS GATES SHALL BE APPROVED PRIOR TO INSTALLATION AND SHALL BE IN WITH STATE&LOCAL CODES. 6. CONTRACTOR SHALL USE 3-5/8"METAL STUDS MINIMUM AT ALL PLUMBING RESPONSIBLE FOR ALL ROOF PENETRATIONS AND PATCHING, ANY SCREENING OF a
<br /> COMPLIANCE WITH LOCAL FIRE AUTHORITY. WALLS. CONTRACTOR TO VERIFY ACTUAL DEPTH REQUIRED, ANY DISCREPANCIES 3. EXISTING ELECTRICAL AND TELEPHONE OUTLETS LOCATED ON DEMOLISHED WALLS ROOF-MOUNTED MECHANICAL UNIT REQUIRED BY GOVERNING JURISDICTION.
<br /> 5. DECORATIVE MATERIALS SHALL BE MAINTAINED IN A FLAME-RETARDANT SHALL BE REPORTED TO THE ARCHITECT. ARE TO BE REMOVED INCLUDING CONDUIT AND WIRING BACK TO JUNCTION BOX. o w
<br /> 6. FIRE SPRINKLER SYSTEM(S)SHALL MEET STATE&LOCAL FIRE CODES AND BE CONDITION. LOCATIONS ARE TO BE PATCHED AND REPAIRED TO BE FLUSH WITH ADJACENT W
<br /> z
<br /> PROVIDED TO PROTECT ENTIRE BUILDING INCLUDING PROJECTIONS OVER 4'-0" 7. USE WATER RESISTANT GYPSUM BOARD/FIBER BOARD AT ALL AREAS SUBJECT TO WALL SURFACE. W �
<br /> AND SPRAY BOOTH. 6. SUBMIT THE FOLLOW9NG SAMPLES FOR ARCHITECT'S APPROVAL: MOISTURE OR WHERE TILE IS USED.
<br /> A. THREE(3) 12"X 12"SAMPLES FOR ALL PAINT AND STAIN BRUSHOUTS, 4. WHERE PLUMBING FIXTURES ARE BEING REMOVED OR WHERE EXPOSED PLUMBING a z 2
<br /> 7. FIRE SPRINKLER SYSTEM(S)AND ALL CONTROL VALVES, INCLUDING EXTERIOR VINYL AND FABRIC FINISHES AND COLORS APPLIED TO A SUBSTRATE WHICH 8. ALL PLUMBING WORK SHALL BE IN ACCORDANCE WITH LOCAL AND NATIONAL PIPES OCCUR, CAP LINES BEHIND FINISHED SURFACES. PATCH AND REPAIR AS W i i
<br /> SHALL BE SUPERVISED BY A U.L. LISTED CENTRAL ALARM STATION OR PER REQUIRED.
<br /> IS REPRESENTATIVE OF THE SURFACE TO BE FINISHED. SUBMIT PAINT CODES. o 0
<br /> STATE&LOCAL FIRE CODES. SAMPLES FROM THE PAINT LOT OR LOTS INTENDED FOR APPLICATION. a 9
<br /> 9. ALL HOT WATER LINES SHALL BE PROPERLY INSULATED. SEE PLUMBING 5. ALL EXISTING CONSTRUCTION WHERE INDICATED INCLUDING ELECTRICAL,
<br /> 8. ALL VALVES CONTROLLING THE WATER SUPPLY FOR AUTOMATIC SPRINKLER B. ONE(1)24"X 24"MOCK-UP WITH SAMPLE SEAM(CENTERED)OF ALL DRAWINGS. TELEPHONE,PLUMBING AND MECHANICAL DEVICES NOT OTHERWISE INDICATED ON G.C. INSTRUCTIONS
<br /> THESE CONSTRUCTION DRAWINGS SHALL BE REMOVED IN A CAREFUL MANNER SO
<br /> SYSTEMS AND WATER-FLOW SWITCHES ON ALL SPRINKLER SYSTEMS SHALL BE FABRIC AND VINYL FINISHES AND COLOR. w c
<br /> 10. ALL PLUMBING CLEAN-OUTS SHALL BE INSTALLED WHERE READILY ACCESSIBLE. AS NOT TO DAMAGE ADJOINING CONSTRUCTION. w
<br /> ELECTRICALLY MONITORED WHERE THE NUMBER OF SPRINKLERS IS(100)OR CONTRACTOR SHALL COORDINATE ALL CLEAN-OUT LOCATIONS WITH EQUIPMENT, u
<br /> MORE. C. THREE(3) 12"X 12"SAMPLES OF ALL FLOOR COVERING. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE ALL EXISTING oo o
<br /> AND CABINETS. SUBMIT A PLAN OF ALL PROPOSED LOCATIONS TO ARCHITECT SUBMITTALS
<br /> i
<br /> FOR APPROVAL PRIOR TO INSTALLATION. UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT THEM FROM
<br /> 9. ELECTRICAL SUBCONTRACTORS TO INSTALL WIRING FOR FIRE SPRINKLER, ALARM D. SUBMIT ACTUAL CUTTINGS OF EACH PRODUCT FOR COLOR/QUALITY CONTROL. DAMAGE. THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR 1. AT THE START OF JOB PROVIDE w
<br /> E A SCHEDULE OF ALL ANTICIPATED SUBMITTALS a n
<br /> BELL AND TELEPHONE WARNING AS REQUIRED BY FIRE DEPARTMENT, AND DATES. FLAG SUBMITTALS WHICH ARE OR COULD BE CRITICAL PATH. FLAG
<br /> 11. ALL MILLWORK SHALL CONFORM TO STATE&LOCAL WOODWORKING STANDARDS. REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN o
<br /> 7. WHERE MATERIALS ARE NOT RETURNABLE, SUBMIT SAMPLES TO ARCHITECT CONJUNCTION WITH THE EXECUTION OF HIS WORK. SUBMITTALS THAT WILL BE REQUESTED TO BE EXPEDITED FASTER THAN THE m
<br /> 10. INSTALLATION OF FIRE ALARM SYSTEMS SHALL BE IN ACCORDANCE WITH STATE& BEFORE PLACING FULL ORDERS. STANDARD 7-10 DAYS.
<br /> LOCAL FIRE CODES. 12. FIELD MEASURE AS REQUIRED FOR ALL MILLWORK CONDITIONS PRIOR TO 7, ALL EXISTING BUILDING UTILITIES SHALL REMAIN IN OPERATION DURING
<br /> FABRICATION. CONSTRUCTION. PROVIDE REROUTING OF UTILITIES SERVING ADJACENT AREAS
<br /> 8. SUBMIT SEAMING PLAN FOR ALL FLOOR FINISHES TO ARCHITECT FOR APPROVAL 2. A SUBMITTAL LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A
<br /> 11. COMPLETE PLANS AND SPECIFICATIONS FOR ALL FIXED FIRE PROTECTION PRIOR TO ORDER. THAT ARE TO MAINTAIN UNINTERRUPTED SERVICE. ANY TEMPORARY SUSPENSION CURRENT COPY IS TO BE INCLUDED WITH EACH SUBMISSION. i
<br /> EQUIPMENT INCLUDING AUTOMATIC SPRINKLERS AND OTHER FIRE-PROTECTION 13. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR ARCHITECT AND TENANT OF SERVICE SHALL BE COORDINATED AND APPROVED BY THE FACILITY MANAGER,
<br /> SYSTEMS, SHALL BE SUBMITTED BY INSTALLING CONTRACTOR. SUCH PLANS 9. NOTIFY ARCHITECT IMMEDIATELY OF ITEMS WITH LONG LEAD TIMES. APPROVAL PRIOR TO MANUFACTURE OF ANY CABINET WORK, MILLWORK AND ANY NOT LESS THAN 24-HOURS IN ADVANCE. r
<br /> SHALL BE APPROVED BY LOCAL FIRE AUTHORITY PRIOR TO INSTALLATION. OTHER SPECIAL ITEMS REQUIRING CUSTOM SHOP FABRICATED WORK. 3. ALL SUBMITTALS MUST BE REVIEWED AND APPROVED WITH A STAMP AND
<br /> 10. ALL PAINT FINISH OF METAL PARTS OF DOORS, HANDRAILS, PERIMETER 8. THE CONTRACTOR WILL VERIFY AND CONFORM TO ALL REQUIREMENTS OF ALL SIGNATURE BY THE GENERAL CONTRACTOR PRIOR TO SUBMISSION. THE REVIEW a
<br /> 12. LOCATIONS AND CLASSIFICATIONS OF FIRE EXTINGUISHERS SHALL BE IN ENCLOSURES,ETC., SHALL BE SEMI-GLOSS,U.O.N. 14. CONTRACTOR TO VERIFY FINAL LOCATION FOR CANTILEVERED COUNTERS AND UTILITY COMPANIES UNLESS OTHERWISE NOTED IN THE PLANS AND WILL INCLUDE BUT NOT BE LIMITED TO:
<br /> ACCORDANCE WITH STATE&LOCAL FIRE CODES AND PLACEMENT IS SUBJECT TO IN SUPPORT BRACKETS PRIOR TO GYPSUM BOARD FINISHING OF WALLS. SPECIFICATIONS. 3.1. CONFIRMING THAT THE SUBMITTAL MEETS THE REQUIREMENTS OF THE
<br /> THE APPROVAL OF THE FIRE INSPECTOR. VERIFY QUANTITY&EXACT LOCATION 11. WHERE PAINT COLORS CHANGE,CORNERS ARE TO BE CUT-IN FREE OF ALL FINAL INSTALLATION HEIGHTS FOR IN-WALL SUPPORT BRACKETS MUST MEET CONTRACT DOCUMENTS. o
<br /> FROM FIRE DEPARTMENT PRIOR TO ORDERING. OVERLAPPING. ALL ACCESSIBILITY CODES REQUIREMENTS WITH COUNTERTOP MATERIAL THICKNESS g THE DEMOLITION PLAN KEYNOTES ARE DIAGRAMMATIC AND GENERAL IN NATURE. 3.2. COORDINATION HAS TAKEN PLACE WITH ALL INTERCONNECTING TRADES
<br /> INCLUDED. THE INTENT IS TO ILLUSTRATE THE COMPLETE DEMOLITION OF THE SPACES 3.3. THE SUBMITTAL IS COMPLETE AND COMPREHENSIVE a
<br /> 13. AT LEAST ONE(1)FIRE EXTINGUISHER WITH A MINIMUM RATING OF: 12. PRIOR TO THE INSTALLATION OF WALL COVERINGS, SURFACES SHALL BE 15. PROVIDE AND INSTALL ALL NECESSARY WALL BACKING,STIFFENERS, BRACING, INDICATED UNLESS NOTED OTHERWISE. FIELD VERIFICATION OF EXISTING
<br /> 2-A-10B:C(FOR OFFICE), OR 10-A-80B:C(FOR WAREHOUSE), SHALL BE PROPERLY PREPARED WITH SEALER PER MANUFACTURER'S RECOMMENDATIONS. CONDITIONS AND SPECIFIC QUANTITIES IS THE RESPONSIBILITY OF THE 4. REQUESTS ON SUBMITTALS FOR DIMENSIONS WHICH CAN BE DISCERNABLE
<br /> BACK-UP PLATES AND/OR SUPPORTING BRACKETS AS REQUIRED FOR THE THROUGH MATHEMATICAL MEANS FROM INFORMATION ALREADY PROVIDED ON THE N
<br /> PROVIDED WITHIN THERE MAXIMUM TRAVEL DISTANCE FOR EACH 3,000 SQUARE INSTALLATION OF WALL-MOUNTED OR SUSPENDED EQUIPMENT OR BUILT-IN ITEMS. CONTRACTOR. CONTRACT DOCUMENTS WILL NOT R PROVIDED.
<br /> FEET OR PORTION THEREOF ON EACH FLOOR. 13. CONTRACTOR TO VERIFY CONDITION AND LEVEL OF FLOOR SO N TO RECEIVE VERIFY REQUIREMENTS WITH MANUFACTURERS PRIOR TO INSTALLATION. SUPPLY
<br /> NEW FINISHES WITHOUT BOWING AT FLOOR OR WALL BASE. CONTRACTOR IS 10. REMOVAL AND DISPOSAL OF DEMOLITION DEBRIS IS THE RESPONSIBILITY OF THE
<br /> 14. STORAGE, DISPENSING OR USE OF ANY FLAMMABLE AND COMBUSTIBLE LIQUIDS, RESPONSIBLE FOR ALL FLOOR PREPARATION. CATALOG CUT SHEETS FOR ARCHITECT'S APPROVAL. CONTRACTOR. VERIFY THE HAULING ROUTE THROUGH THE BUILDING,THE 5. SUBMITTALS NOT REQUESTED BY THE CONTRACT DOCUMENTS MAY OR MAY NOT
<br /> FLAMMABLE AND COMPRESSED GASES, AND OTHER HAZARDOUS MATERIALS SHALL DEMOLITION STAGING AREA, AND THE LOCATION OF THE DUMPSTERS WITH THE BE REVIEWED AT THE DESIGN TEAMS DISCRETION.
<br /> PROVIDE AND INSTALL ALL NECESSARY ELECTRICAL CONNECTIONS AND PLUMBING
<br /> COMPLY WITH STATE&LOCAL FIRE CODES. THE STORAGE AND USE OF 14. ALL CARPETING SHALL BE INSTALLED WITH GLUE DOWN METHOD,U.O.N. 16, OWNER PRIOR TO THE START OF DEMOLITION. DISPOSAL OF RUBBISH SHALL BE o
<br /> SUPPLY,FITTINGS&CONNECTORS TO COMPLETE INSTALLATION OF APPLIANCES&
<br /> HAZARDOUS MATERIALS SHALL APPROVED THE FIRE AUTHORITY PRIOR TO DONE IN A LEGAL MANNER.
<br /> ANY MATERIALS BEING STORED O OR USED ON SITE _
<br /> IS REQUIRED PRIOR TO THE STORAGE AND USE OF HAZARDOUS MATERIALS. CARPET IN AN"X"OVER FLOOR HOLE AND INSTALL CARPET OVER TOP, DO NOT PRIOR TO INSTALLATION. SUPPLY CATALOG CUT SHEETS FOR ARCHITECT'S 11. THE OWNER RESERVES THE RIGHT TO SALVAGE ANY DEMOLISHED ITEM. VERIFY SENT DIRECTLY TO ARCHITECT'S CONSULTANTS UNLESS SPECIFICALLY AUTHORIZED -
<br /> TRIM CARPET. APPROVAL. ITEMS TO BE SALVAGED WITH THE OWNER PRIOR TO THE START OF DEMOLITION. BY THE ARCHITECT.
<br /> 15. BUILDING(S)NOT APPROVED FOR HIGH-PILED STOCK(MATERIALS IN CLOSELY 17. EXACT LOCATION OF FIRE EXTINGUISHER CABINETS TO BE CONFIRMED WITH REMOVE, PROTECT, CLEAN, REPAIR FOR REUSE AND TURN OVER SUCH ITEMS AS
<br /> PACKED PILES OR ON PALLETS,OR IN RACKS WHERE THE TOP OF STORAGE 16. ALL V.C.T. TO BE INSTALLED WITH FULL TILE FROM VINYL THRESHOLD STRIP AND DIRECTED BY THE OWNER.
<br /> EXCEEDS 12'-0"IN HEIGHT, AND 6'-0"FOR GROUP"A"PLASTICS AND CERTAIN FULL TILE FROM WALL ADJACENT TO DOOR SWING, U.O.N. ARCHITECT BEFORE INSTALLATION. PROVIDE ADDITIONAL FIRE EXTINGUISHERS& 7. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S J
<br /> OTHER HIGH-HAZARD COMMODITIES). HIGH-PILED STOCK SHALL BE APPROVED CABINETS AS REQUIRED BY THE FIRE DEPARTMENT FIELD INSPECTORS. REVIEW. IF A CHANGE RESULTS IN MODIFICATIONS TO THE CONTRACT PRICE OR i
<br /> 12. IN ORDER TO INSTALL SOME OF THE NEW WORK (INCLUDING,BUT NOT LIMITED
<br /> 17. PROVIDE AND INSTALL SPECIFIED BASE FOR ALL AREAS TO RECEIVE FLOORING. TO MECHANICAL,PLUMBING OR ELECTRICAL IT WILL BE NECESSARY FOR THE SCHEDULE,THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW
<br /> BY THE FIRE AUTHORITY PRIOR TO MATERIALS BEING STORED ON SITE. A 18, CONTRACTOR TO VERIFY LOCATION OF ALL THERMOSTATS WITH ARCHITECT PRIOR ) AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING.
<br /> SEPARATE PLAN SUBMITTAL IS REQUIRED FOR HIGH-PILED STORAGE IN TO INSTALLATION. CONTRACTOR AND HIS SUBCONTRACTORS TO REMOVE AND REPLACE(OR a
<br /> ACCORDANCE WITH STATE&LOCAL FIRE CODES. 18. CONTRACTOR SHALL PROVIDE PRE-FORMED RUBBER BASE CORNERS. DO NOT REFINISH)EXISTING WALLS,FLOORS, OR CEILING IN THE AREAS OF THE BUILDING
<br /> CUT OR BEND STRAIGHT BASE TO MAKE CORNERS. 19. ALL EXITS SHALL HAVE EXIT SIGNS AND ALL BLIND CORRIDOR TURNS SHALL NOT SHOWN ON THESE PLANS. THE CONTRACTOR SHALL INCLUDE ALL RELATED w
<br /> 16. A LETTER OF INTENDED USE MAY BE REQUIRED BY THE FIRE INSPECTOR. COSTS IN HIS BASE BID, WHETHER SHOWN ON THESE PLANS OR NOT.
<br /> 19. MILLWORK LOWER CABINETS ARE NOT TO RECEIVE WALL BASE UNLESS INDICATED HAVE DIRECTIONAL EXIT SIGNS. REQUESTS FOR INFORMATION(RFI'S) z
<br /> 17. ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY ON FINISH PLANS. 20. PREPARE ALL FLOOR SURFACES AS REQUIRED TO RECEIVE FINISHES AS NOTED 13. PROTECT ADJACENT SPACES NOT SCHEDULED FOR DEMOLITION. PATCH AND
<br /> SHOWING THE SPECIFIC RATING. ON FINISH PLAN,ENLARGED FINISH PLANS&FINISH LEGEND. REPAIR DAMAGED FINISHES, ITEMS AND FIXTURES TO REMAIN AND/OR REPLACE 1. THE GENERAL CONTRACTOR IS TO REVIEW ALL PROSPECTIVE R DEI's AND MAKE - Q
<br /> 20. FLOOR FINISHES TO CONTINUE UNDERNEATH "OPEN FLOOR"AREAS E MILLWORK, IN KIND TO MATCH EXISTING FROM DAMAGE DURING THE PROGRESS OF THE EVERY EFFORT TO ANSWER THEM BEFORE SUBMITTING TO THE DESIGN TEAM.
<br /> 18. EXIT SIGNS AND ILLUMINATION SHALL CONFORM TO ALL APPLICABLE BUILDING INCLUDING SINK AREA AND AT ALL UNDER-COUNTER EQUIPMENT AREAS WHICH 21, UNLESS OTHERWISE NOTED,ALL GYPSUM BOARD SURFACES, WALLS, AND CEILINGS WORK. PROVIDE TEMPORARY SAFETY BARRIERS REQUIRED BY CODE AND AS a JM
<br /> AND FIRE CODES. ARE OPEN TO THE FLOOR. INDICATED TO INSURE PUBLIC SAFETY AND TO ALLOW BUILDING OCCUPANCY. o W
<br /> SHALL BE TAPED,SANDED SMOOTH TO A"LEVEL 4"FINISH, SO AS TO RECEIVE 2. MINOR CHANGES IN THE WORK MAY OCCUR AS A RESULT OF THE DESIGN TEAM'S
<br /> PAINT OR WALL COVERING MATERIAL. CONTRACTOR TO SUBMIT FOR APPROVAL, BARRIER LOCATIONS, AND METHOD OF
<br /> 19. EXIT DOORS SHALL O OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY 21. FLOORS SHALL A SLOPED R FLOOR DRAINS. COORDINATE WITH PLUMBING AND REVIEW. IF A CHANGE RESULTS L MODIFICATIONS TO THE CONTRACT PRICE OR
<br /> CONSTRUCTION TO THE ARCHITECT PRIOR TO INSTALLATION. >
<br /> OR ANY SPECIAL KNOWLEDGE OR EFFORT. STRUCTURAL DRAWINGS. M RATED FLOOR CONDITIONS, CONFIRM REMAINING FLOOR SCHEDULE,THE CONTRACTOR WILL ISSUE A CHANGE ORDER REQUEST FOR REVIEW o
<br /> THICKNESS STILL CONFORMS TO MINIMUM RATING REQUIREMENT. 22. PROVIDE SOUND INSULATION AT PERIMETER WALLS OF RES ,LOBBY, AND APPROVAL BY THE OWNER AND ARCHITECT PRIOR TO PROCEEDING.
<br /> AN ACC
<br /> STAIRS, AND ACROSS CEILING OF RESTROOMS TO CREATE AN ACOUSTIC 14. NO STRUCTURAL ELEMENTS ARE INCLUDED IN THIS SCOPE OF WORK.
<br /> 20. PROVIDE OR MODIFY AS NEEDED SPRINKLER ALARM AND SMOKE DETECTION z NN
<br /> ENVELOPE
<br /> 22. CONTRACTOR TO RUN CALCIUM CHLORIDE TEST ON ALL EXISTING OR NEW ,U.O.N. o L.I. J Op
<br /> SYSTEM PER APPLICABLE CODES INCLUDING IF NECESSARY FIR HORNS, STROBE 15. PROVIDE DUST BARRIERS AROUND OPENINGS, TO AND FROM THE CONSTRUCTION
<br /> LIGHTS,CONTROL PANEL CONNECTIONS, SMOKE DETECTORS, AUDIO VISUAL CONCRETE SLABS PRIOR TO INSTALLING ANY FLOORING AND COMPARE RESULTS 3. AN RFI LOG IS TO BE MAINTAINED BY THE GENERAL CONTRACTOR AND A o Q J O
<br /> ALARMS. SUBMIT SHOP DRAWINGS TO THE FIRE MARSHAL FOR APPROVAL. WITH FLOORING MANUFACTURE'S RECOMMENDED MAXIMUM CONTENT FOR 23, PATCH AND FILL VARIOUS OPENINGS AT EXISTING GYPSUM BOARD PARTITIONS AREA. PROVIDE ALL MEANS NECESSARY TO INHIBIT DUST FROM ENTERING CURRENT COPY IS TO BE INCLUDED WITH EACH RFI SUBMISSION ALONG WITH ANY �' ^ 04
<br /> WARRANTIES AND ADHESIVE PRODUCTS. AND SOFFITS FOLLOWING REMOVAL OR INSTALLATION OF ANY SURFACE MOUNTED OTHER PORTIONS OF THE FACILITY. SUBMIT BARRIER LOCATIONS TO THE CRITICAL RESPONSE DUE DATES. a O L.L Q
<br /> OR RECESSED FURNISHINGS,RECEPTACLES,UTILITY PIPING, SHELF STANDARDS& ARCHITECT FOR APPROVAL, PRIOR TO INSTALLATION. w 0')
<br /> ALL OTHER SIMILAR ELEMENTS INDICATED TO BE REMOVED DURING THE Q
<br /> 23. PRIOR TO NEW FLOORING INSTALLATION REMOVE EXISTING FLOOR FINISHES.PATCH 4. RFI's REGARDING METHODS AND MEANS OF CONSTRUCTION WILL NOT BE REVIEWED W
<br /> DEMOLITION PHASE OR INSTALLED DURING THE CONSTRUCTION PHASE: TAPE AND 16. PROVIDE ADEQUATE SHORING,BRACING, BARRICADES AND PROTECTIVE MEASURES Q
<br /> AND REPAIR SUB-FLOOR AS REQUIRED. PREPARE FLOORS AND TRANSITIONS AS AS REQUIRED TO SAFELY EXECUTE THE WORK IN THE CONSTRUCTION AREA AND AND WILL BE REMOVED FROM THE RFI LOG. J -
<br /> SEAL ALL SEAMS WITH JOINT COMPOUND: APPLY NEW FINISH TO MATCH EXISTING
<br /> REQUIRED FOR SMOOTH AND LEVEL FINISH PER APPLICABLE BUILDING CODES. FINISH AT ADJACENT GYPSUM BOARD SURFACES AND FEATHER NEW FINISH WITH THE AREAS ADJACENT TO THE CONSTRUCTION AREA. CEASE OPERATIONS AND i
<br /> EXISTING FINISH TO PROVIDE CONSISTENT&CONTINUOUS FINISH.
<br /> NOTIFY THE ARCHITECT IMMEDIATELY IF THE STRUCTURE APPEARS TO BE N
<br /> 24. ALL FLOORING TRANSITIONS AMONG ALL THE DIFFERING FLOORING MATERIAL ENDANGERED. DO NOT RESUME OPERATIONS UNTIL CORRECTIVE MEASURES HAVE CHANGE ORDERS N
<br /> SPECIFICATION TYPES ARE TO BE A FLUSH TRANSITION. BEEN TAKEN. o W w
<br /> 1. A COMPLETE SCHEDULE OF VALUES OF THE BASE CONTRACT IS TO BE PROVIDED z ^/
<br /> FLOORING TO CARPET, FOR FLUSH INSTALLATION. CEILING NOTES EXIT
<br /> 25. FEATHER SUB-FLOOR UP FOR A)TILE FLOORING TO CARPET AND B)VINYL 17. CONTRACTOR SHALL MAINTAIN REQUIRED MEANS OF EGRESS AND ENSURE THAT TO THE OWNER AND ARCHITECT PRIOR TO THE START OF ANY WORK. 0.
<br /> ROUES ARE
<br /> RELOCATE LIGHTED
<br /> AND AND/OR PROTECTED
<br /> IE SMOKE PROTECT WITH
<br /> ORSCODE
<br /> AND O J i L J
<br /> 26. INSTALL METAL TRANSITION STRIPS WHERE TILE MEETS ALL OTHER FLOORINGREQ 2. ALL CHANGE ORDER REQUESTS ARE TO BE REVIEWED AND APPROVED BY THE w >
<br /> TYPES. PROVIDE LOW PROFILE TRANSITION STRIP WHERE ALL OTHER DIFFERENT LIFE SAFETY EQUIPMENT FOR ADEQUATE COVERAGE. OWNER AND ARCHITECT PRIOR TO SUBMISSION OF A CHANGE ORDER. U J 1 Lu
<br /> FLOOR TYPES MEET, VERIFY COLOR. 18. PROVIDE TEMPORARY NON-COMBUSTIBLE CONSTRUCTION BARRIERS WHERE i
<br /> 1. SEE ELECTRICAL ENGINEERING DRAWINGS FOR SPECIFICATIONS OF NEW BUILDING REQUIRED BY CODE AND THE GOVERNING FIRE AUTHORITY.MINIMUM 3. CHANGE ORDER REQUESTS ARE TO INCLUDE A COMPLETE BREAKDOWN BY TRADE W
<br /> 27. CONTRACTOR TO HEAT/CHEMICAL SEAM VINYL FLOORING AS PER STANDARD LIGHT FIXTURES, SWITCHES, EXIT SIGNS, ETC. REQUIREMENTS: ALONG WITH TRADE BACKUP AND UNIT PRICING WHERE APPLICABLE. o
<br /> MANUFACTURER' -
<br /> S SPECIFICATIONS AND SEAL ALL VINYL FLOORS PERJ
<br /> MANUFACTURER'S MAINTENANCE SPECIFICATIONS. 2. ALL REPLACEMENT FLUORESCENT LAMPS TO MATCH BUILDING STANDARD- SAME A. FULL HEIGHT WALL FROM FLOOR TO CEILING.
<br /> COLOR AND MANUFACTURER. 4. A CHANGE ORDER REQUEST AND CHANGE ORDER LOG IS TO BE MAINTAINED BY
<br /> B. STUDS AT 24"O.C.,WITH 5/8"TYPE'X'GYPSUM BOARD. THE GENERAL CONTRACTOR AND SUBMITTED ALONG WITH EACH CHANGE ORDER w o
<br /> 28. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CARPET C. NON-COMBUSTIBLE ACCESS DOOR WITH(3)HINGES AND SPRING CLOSER. REQUEST. W O
<br /> INSTALLATION INSTRUCTIONS.USING ADHESIVES AND INSTALLATION METHODS 3. FIELD VERIFY EXISTING CEILING GRID LOCATION AND NOTIFY ARCHITECT OF ANY 3
<br /> REQUIRED INSTRUCTIONS TO MAINTAIN PRODUCT'S WARRANTY.CONTACT CARPET DISCREPANCIES ON PLANS. 19. SURVEY EXISTING FLOORS AND CLEARLY MARK ON FLOOR SURFACE THE O 0
<br /> SALES REPRESENTATIVE WITH QUESTIONS PRIOR TO PROCEEDING. LOCATIONS OF ALL BEAMS AND JOISTS. MARK ALL CORE DRILL PENETRATIONS
<br /> 4. WHERE DISCREPANCIES IN LOCATION OF LIGHT FIXTURES,AIR DIFFUSERS, GRILLES, AND RECEIVE STRUCTURAL ENGINEER'S APPROVAL PRIOR TO DRILLING CONCRETE. PROJECT SCHEDULE 3 i
<br /> 29. FLOOR COVERING INSTALLER TO FOLLOW MANUFACTURER'S SPECIFIED CONTOURED ETC. OCCUR ON THE ELECTRICAL ENGINEERING PLANS, THE ARCHITECTURAL 1. A COMPLETE CONSTRUCTION SCHEDULE OF ALL PORTIONS OF THE WORK TO BE
<br /> RUBBER BASE INSTALLATION INSTRUCTIONS USING ADHESIVES AND INSTALLATION >
<br /> CLARIFICATIONS. 20. CUT RIGID MATERIALS USING MASONRY SAW OR CORE DRILL. PNEUMATIC TOOLS
<br /> PLANS SHALL GOVERN. NOTIFY ARCHITECT OF ANY DISCREPANCIES FOR PROVIDED TO THE OWNER AND ARCHITECT PRIOR TO START OF ANY WORK. w
<br /> METHODS REQUIRED TO MAINTAIN PRODUCT'S WARRANTY. ARE NOT ALLOWED WITHOUT PRIOR APPROVAL. uj
<br /> 5. FIELD VERIFY ALL CLEARANCES OF DUCTS, PIPES, SPRINKLERS, ETC.,AND NOTIFY a
<br /> 30. FLOOR COVERING INSTALLER REQUIRED TO PROVIDE MINIMAL SEAMS JOINTS AT 21. ALL CORE DRILLING OR OTHER NOISY WORK SHALL BE SCHEDULED 48-HOURS IN 2. THE SCHEDULE SHALL NOT EXCEED TIME LIMITS CURRENT UNDER THE CONTRACT
<br /> / ARCHITECT OF ANY CONFLICTS PRIOR TO INSTALLATION OF LIGHTS, ETC. ADVANCE WITH THE OWNER. m
<br /> ALL LOCATIONS FOR FLOOR AND WALL BASE MATERIAL INSTALLATION. PROVIDE DOCUMENTS.
<br /> LOW VOC,BUT HEAVY DUTY ADHESIVES TO ENDURE HEAVY FOOT TRAFFIC,CARTS 6. PLACEMENT OF LIGHT FIXTURES IN AREAS WHERE MAIN DUCTS MAY CAUSE a
<br /> AND TO MAINTAIN PRODUCT'S WARRANTY. 22. APPLY CEMENT BASE FLOOR PATCH AS REQUIRED TO FILL DINGS,NAIL HOLES,
<br /> INTERFERENCE MUST BE APPROVED BY ARCHITECT PRIOR TO INSTALLATION. x CHIPS AND CRACKS. 3. THE SCHEDULE SHALL BE REVISED AT APPROPRIATE INTERVALS AS REQUIRED BY
<br /> 31. PRIOR TO PAINTING, WALLS MUST BE PATCHED AND REPAIRED, CLEAN AND DRY 7, CONDUITS ABOVE CEILING MUST BE A MINIMUM OF 12"ABOVE THE CEILING GRID. THE CONDITIONS OF THE WORK AND PROJECT AND THE CONTRACTOR SHALL Ix
<br /> AND PROPERLY MEMBERED AND ALIGNED SO,AS TO LEAVE NO EVIDENCE OF 23. AT FLOOR AREAS SCHEDULED TO RECEIVE NEW FLOOR COVERING, REMOVE NOTIFY THE OWNER AND ARCHITECT IF FOR ANY REASON THE SCHEDULE IS o
<br /> PATCHING OR REPAIRS. ALL SCREW AND NAIL HEADS MUST BE SET AND 8. NO COMBUSTIBLE MATERIALS SHALL BE USED IN THE PLENUM SPACE, INCLUDING EXISTING FLOOR COVERING AND PREPARE SUBSTRATE FOR NEW FLOOR COVERING EXTENDED. 3
<br /> SPACKLED. ALL JOINTS MUST BE TAPED AND COVERED WITH JOINT COMPOUND. ALUMINUM FLEX, ALUMINUM CONDUIT, AND POT METAL CONNECTORS. PER SPECIFICATIONS AND MANUFACTURER'S REQUIREMENTS. Y
<br /> JOINTS THAT ARE FILLED TO BE SANDED SMOOTH AND DUST REMOVED PRIOR TO 4. A THREE WEEK LOOK-AHEAD SHALL BE REVIEWED REGULARLY AT EACH AOC i
<br /> RECEIVING NEW PAINT FINISH APPLICATION. 9. ALL JUNCTION BOXES AND MECHANICAL EQUIPMENT REQUIRING ACCESS FOR 24. AT ABANDONED PENETRATIONS OF FIRE RATED WALLS, CEILING OR FLOOR MEETING WHICH WILL BE IN-LINE W
<br /> A ITH THE OVERALL CONSTRUCTION SCHEDULE. o
<br /> SERVICE SHALL BE LOCATED OVER ACOUSTICAL CEILINGS, NO ACCESS HATCHES CONSTRUCTION,COMPLETELY SEAL VOIDS WITH FIRE RATED MATERIAL TO FULL z
<br /> 32. PRIOR TO PAINTING OVER WALL COVERING,SECURELY GLUE DOWN ANY LIFTING OR SHALL BE INSTALLED IN GYPSUM BOARD CEILINGS WITHOUT PRIOR APPROVAL BY THICKNESS OF THE PENETRATED ELEMENT. ALL PATCHING OF EXISTING WORK TO a
<br /> BUCKLING AND HIDE ALL SEAMING OR BUMPS. REMAIN SHALL MATCH FINISH PER SCHEDULE OR WHERE UNSCHEDULED TO
<br /> ARCHITECT. (NO EXCEPTION) O
<br /> MATCH EXISTING FINISHES TO REMAIN,AND SHALL MEET OR EXCEED FIRE RATING o _
<br /> 33. WALLS TO HAVE AT LEAST ONE COAT OF COLORED PRIMER AND TWO COATS OF INDICATED ON FLOOR PLAN AND AS REQUIRED BY THE FIRE/LIFE SAFETY 10. RESTROOM NOTES
<br /> 10. ALL SPRINKLER HEADS AT HARD-LID CEILINGS ARE TO BE FULLY RECESSED AND w V SPECIFIED PAINT FINISH TYPE. PAINT TO BE A LOW VOC UNLESS U.O.N. HIGH I
<br /> CONCEALED. HEADS ARE TO BE CENTERED BETWEEN LIGHTS IN A UNIFORM
<br /> TRAFFIC/WEAR ABILITY WITH GOOD SCRUB AND CLEANING ABILITY. VERIFY ALL ARCHITECTURAL PATTERN. G.C. TO PROVIDE A SUBMITTAL WITH SPRINKLER HEAD
<br /> WITH TENANT OR OWNER PRIOR TO PURCHASING PAINT. LOCATIONS FOR ARCHITECT'S APPROVAL PRIOR TO INSTALLATION. 25. COORDINATE EXISTING SPRINKLER LINE AND HEAD LOCATION WITH NEW PLAN.
<br /> SUBMIT SPRINKLER SHOP DRAWINGS TO ARCHITECT FOR REVIEW WITH THE CITY m W �..r
<br /> 34. PAINT ALL SPEAKER COVERS AND HVAC GRILLS IN GYPSUM BOARD WALLS AND FIRE DEPARTMENT, 1. PROVIDE DRAIN WITH TRAP PRIMER FOR EACH RESTROOM IF THERE ARE TWO OR z LLI
<br /> CEILINGS TO MATCH ADJACENT PAINT COLOR AS SPECIFIED. 11. ALL GYPSUM BOARD CEILINGS ARE TO BE INSTALLED WITH LINEAR DIFFUSERS. MORE FIXTURES. SLOPE FLOOR TO DRAIN AT MIN. 1 8"PER FOOT. J o
<br /> G.C. TO PROVIDE A SUBMITTAL NTH ALL LINEAR DIFFUSER LOCATIONS PRIOR TO / O
<br /> INSTALLATION. 26. CONTRACTOR IS RESPONSIBLE FOR BUILDING SECURITY DURING DEMOLITION i O
<br /> 35. PRIOR TO INSTALLING WALL TILES AND WALL BASE TILE,WALLS MUST BE PHASE. PROTECT ALL OPENINGS FROM WEATHER CONDITIONS AND SECURE THEM 2, PROVIDE SINGLE LEVER HANDLE FAUCET SET AT 17"MAX. FROM THE FRONT EDGE "' Z
<br /> PATCHED AND REPAIRED, CLEAN AND DRY AND BE PROPERLY MEMBERED AND TO PREVENT VANDALISM. o
<br /> 12. LOCATE RECESSED DOWN LIGHTS,WALL WASHERS, SMOKE DETECTORS,EXIT SIGNS, OF THE SINK COUNTER.
<br /> ALIGNED,S E AS M LEAVE E EVIDENCE OF PATCHING OR REPAIRS. ALL SCREW a
<br /> SPEAKERS,FIRE SPRINKLERS, ETC. IN CENTER OF 24"x24"CEILING TILES OR IN 27. DO NOT PERFORM ANY WORK THAT IMLL VOID WARRANTIES OF EXISTING J L
<br /> AND NAIL HEADS MUST M SET AND SHACKLED. ALL JOINTS MUST BE TAPED AND 3. VERIFY BUILDING STANDARD FOR WALL-HUNG/DROP-IN COUNTER SINK WHERE Q
<br /> COVERED WITH JOINT COMPOUND.JOINTS THAT ARE FILLED ARE TO BE SANDED CENTER OF 24"x24"PORTION OF 24"x48"CEILING TILES,UNLESS OTHERWISE WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS WITHOUT PRIOR APPLICABLE.
<br /> SMOOTH AND BUMP FREE WITH DUST REMOVED PRIOR TO RECEIVING MORTAR NOTED. APPROVAL FROM THE OWNER. J LL.I
<br /> BED/BOND COAT AND WALL TILES. 4. TOILET PAPER DISPENSERS SHALL NOT BE OF TYPE THAT CONTROLS DELIVERY, Z �••�
<br /> 13. PROVIDE SWITCHES AND LIGHT SENSORS FOR OPEN EA AND PRIVATE OFFICES. 28. ARCHITECT ASSUMES NO RESPONSIBILITY RELATING TO ANY TOXIC MATERIALS, OR THAT DO NOT ALLOW CONTINUOUS PAPER FLOW.OPERABLE PARTS SHALL BE LJ,J O
<br /> ACTUAL LOCATION OF ALL SWITCHES TO BE DETERMINED B BY ELECTRICAL INCLUDING ASBESTOS,AND ASSUMES NO RESPONSIBILITY TO ITS EXISTENCE OR
<br /> 36. ALL WALL TILES ARE TO HAVE MORTAR BED/BOND COAT THICKNESS TO OPERABLE WITH ONE HAND AND SHALL NOT REQUIRE TIGHT GRASPING, PINCHING ¢
<br /> ENGINEER. REMOVAL. THE OWNER WILL TAKE ACTION FOR DIRECTLY CONTRACTING WITH A 3 (�
<br /> ACCOMMODATE THE VARYING THICKNESSES OF ALL MATERIAL TYPES OF TILE CONSULTANT OR SPECIALIST, LICENSED BY THE STATE,FOR SUCH SERVICES OR TWISTING OF THE WRIST. THE FORCE REQUIRED TO ACTIVATE OPERABLE PARTS
<br /> ¢
<br /> SPECIFIED FOR WALL INSTALLATION `MTH A FLUSH FRONT FACE. wo g
<br /> 14. WHERE EXIT SIGNS ARE REQUIRED PER STATE&LOCAL CODES, THEY SHALL BE SHOULD THOSE SERVICES BE REQUIRED ON THE PROJECT. SHALL BE 5 POUNDS MAX. A--�
<br /> ILLUMINATED PER SAID CODES AND THE NEC. LOCATIONS SHALL BE r
<br /> 0 37. ALL TRANSLUCENT GLASS TILE SPECIFIED ARE TO RECEIVE UNIFORM COVERAGE 5. OPERABLE PARTS OF ALL ACCESSORIES SHALL COMPLY WITH ALL APPLICABLE N
<br /> COORDINATED WITH THE ARCHITECT. 29. IF THE EXISTING BUILDING CONSTRUCTION IS CLASSIFIED SUCH THAT
<br /> BY BACK BUTTERING TILES AND TROWEL RIDGES FLATTENED PRIOR TO SETTING ACCESSIBILITY CODES AND STANDARDS.
<br /> TRANSLUCENT GLASS TILES. FIREPROOFING INSULATION IS PRESENT, THEN THE CONTRACTOR,PRIOR TO
<br /> 15. PROVIDE BACK-UP POWER FOR EXIT SIGNS PER STATE&LOCAL CODES. STARTING ANY WORK,SHALL VERIFY THE CURRENT FIRE-RESISTANCE RATING(S) ao
<br /> OF THE EXISTING BUILDING ELEMENTS. IF THE EXISTING FIREPROOFING 6. WATER SUPPLY AND DRAIN PIPES UNDER LAVATORIES AND SINKS SHALL BE o
<br /> 38. FLOORS OF TOILETS, BATHING AND SHOWER ROOMS SHALL HAVE A SMOOTH, ( ) INSULATED OR OTHERWISE CONFIGURED TO PROTECT AGAINST CONTACT. THERE o co
<br /> 16. THE MEANS OF EGRESS, INCLUDING THE EXIT DISCHARGE, SHALL BE ILLUMINATED / SHALL BE NO SHARP OR ABRASIVE SURFACES UNDER LAVATORIES AND SINKS.HARD, NONABSORBENT SURFACE. THE INTERSECTION OF SUCH FLOORS WITH INSULATION IS DAMAGED AFFECTED DURING THE COURSE OF THE WORK, AS
<br /> ` TO A LEVEL OF NOT LESS THAN ONE FOOT CANDLE AT THE WALKING SURFACE ¢
<br /> WALLS SHALL HAVE A SMOOTH, HARD, NONABSORBENT VERTICAL BASE AS DEFINED BY THIS PROJECT SCOPE, THEN THE CONTRACTOR SHALL PATCH/REPAIR Q
<br /> AT ALL TIMES THE BUILDING SPACE SERVED BY THE MEANS OF EGRESS IS r
<br /> j SPECIFIED N FINISH PLANS OR RESTROOM ELEVATIONS. BASE SHALL EXTEND OCCUPIED. THE FIREPROOFING INSULATION TO A CONDITION THAT SHALL MATCH OR EXCEED r
<br /> UPWARD ONTO THE WALLS NOT LESS THAN 4 INCHES. THE ORIGINAL FIRE-RESISTANCE RATING(S)OF THE EXISTING BUILDING w F
<br /> 0 17. EMERGENCY LIGHTING SHALL BE(2)SEPARATE SOURCES OF POWER AND SHALL ELEMENT(S). o o
<br /> 39. WALLS AND PARTITIONS WITHIN 2 FEET OF SERVICE SINKS, URINALS AND WATER COMPLY WITH THE NEC. (�
<br /> j CLOSETS SHALL HAVE A SMOOTH, HARD,NONABSORBENT SURFACE TO A HEIGHT 30. CONTRACTOR TO RELOCATE AND REUSE EXISTING DOORS AND HARDWARE WHERE y
<br /> j OF NOT LESS THAN 4 FEET ABOVE THE FLOOR. 18. PROVIDE FIRE DAMPERS AT ALL SUPPLY AND RETURN AIR OUTLETS, INLETS OR POSSIBLE.
<br /> 40. CONTROL JOINTS AT GYPSUM BOARD ASSEMBLIES: THE MAXIMUM RECOMMENDED DUCTS PENETRATING FIRE RATED ASSEMBLIES, ENCLOSURES, WALLS,FLOORS OR •-
<br /> i CONTROL JOINT SPACING FOR WALLS AND CEILINGS WITHOUT PERIMETER RELIEF IS
<br /> SURFACES, AND AS REQUIRED BY THE FIRE DEPARTMENT. 31. EXISTING DOORS TO REMAIN U.O.N. a
<br /> 30 LINEAR FEET OR 900 SQUARE FEET OF SURFACE AREA,WITH PERIMETER z PA PM: KWH/LL
<br /> RELIEF IS 50 LINEAR FEET OR 2,500 SQUARE FEET OF SURFACE AREA.EXTERIOR 19. CONTRACTOR SHALL PROVIDE EMERGENCY LIGHTING, STROBE LIGHTS, 32. ALTERNATE CONSTRUCTION WASTE DISPOSAL-RECYCLING OF ACOUSTICAL TILES o
<br /> JOINT SPACING IS RECOMMENDED AT 30 LINEAR FEET OR 900 SQUARE FEET OF AUDIO-VISUAL ALARMS AND OCCUPANCY SENSORS TO MEET ALL APPLICABLE a DRAWN BY: N.GARLOCK E
<br /> SURFACE AREA. CODES. A. CEILING MATERIAL BEING RECLAIMED MUST BE KEPT DRY AND FREE FROM DEBRIS.
<br /> B. BEFORE DISPOSING OF CEILINGS, CONTACT THE ARMSTRONG RECYCLING CENTER
<br /> ¢` 20. CONTRACTOR SHALL PROVIDE LAMPS WITH TYPE IC RATED HOUSING WHERE AT 877-276-7876,SELECT OPTION#4 TO TALK TO A CONSULTANT. THEY WILL JOB NO.: SEA22-6147-00 Q
<br /> 41. CONSTRUCTION JOINTS(EXPANSION JOINTS)AT GYPSUM BOARD ASSEMBLIES: VERIFY THE CONDITION OF THE MATERIAL AND THAT IT MEETS THE ARMSTRONG
<br /> CONSTRUCTION JOINTS ARE REQUIRED AT CONTINUOUS GYPSUM BOARD SURFACES IT COME IN DIRECT CONTACT WITH INSULATION. a
<br /> o REQUIREMENTS FOR RECYCLING. CONSULTANT WILL PROVIDE ASSISTANCE TO o
<br /> WITH DISSIMILAR WALL STRUCTURE. 21. EXIT SIGNS SHALL BE INTERNALLY OR EXTERNALLY ILLUMINATED AT ALL TIMES FACILITATE THE RECYCLING OF CEILING MATERIAL. a SHEET Q
<br /> AND SHALL BE CONNECTED TO AN EMERGENCY POWER SYSTEM (BATTERIES, UNIT z
<br /> N EQUIPMENT OR AN ON-SITE GENERATOR)THAT WILL AUTOMATICALLY ILLUMINATE 10.2
<br /> 0.L�\ m
<br /> THE EXIT SIGNS FOR A DURATION OF NOT LESS THAN 90 MINUETS. �_ Q
<br /> w x o
<br /> �' m U