My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ATTACHMENT C <br />ENERGY RATE SCHEDULE <br />Effective through March 31, 2026 <br />Labor Classification Code Billing Rate <br />Project Manager VI PJM6 $332 <br />Structural Engineering Designer I END1 $131 <br />Structural Engineering Designer II END2 $140 <br />Structural Engineer Ill ENG3 $162 <br />Structural Engineer IV ENG4 $184 <br />Structural Engineer V ENG5 $216 <br />Structural Engineer VI ENG6 $249 <br />Structural Engineer VII ENG7 $297 <br />Subject Matter Expert I SME1 $246 <br />Subject Matter Expert II SME2 $291 <br />• Mileage will be reimbursed at the current federal rate. <br />• Per Diem will be billed at the current GSA amount. <br />• Expenses will be billed at cost. <br />• Outside services will be billed at cost plus ten percent (10%). <br />• Billing rates are subject to annual adjustment April of each year. <br />• This Rate Schedule contains information that may be privileged, confidential, and <br />exempt from disclosure under applicable law. Any unauthorized disclosure, copying, or <br />distribution of this document or any of its contents is prohibited. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.