My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
11 <br />Progressive Design Build Contract <br /> <br />7.6.1.11 Costs incurred in preventing damage, injury, or loss in case of an emergency <br />affecting the safety of persons and property except to the extent caused by Design- <br />Builder’s negligence. <br /> <br />7.6.1.12 Other costs reasonably and properly incurred in the performance of the Work to <br />the extent approved in writing by Owner. <br /> <br />7.6.1.13 Site security, temporary fencing, signage and similar security and safety <br />measures for active construction areas. <br /> <br />7.6.1.14 Costs for agreed-upon Allowance Items as described and defined in Section 7.8 <br />herein. <br /> <br />7.6.2 Non-Reimbursable Costs. The following shall be excluded from the Cost of the Phase 2 <br />Work: <br /> <br />7.6.2.1 Compensation for Design-Builder’s personnel stationed at Design-Builder’s <br />principal or branch offices, except as provided for in connection with Sections 7.6.1.1, <br />7.6.1.2, and 7.6.1.3, costs associated with Construction General Conditions Work, items <br />intended to be covered by the Design-Build Fee, and Pass-Through Costs. <br /> <br />7.6.2.2 General expenses not specifically provided for herein. <br /> <br />7.6.2.3 The cost of Design-Builder’s capital used in the performance of the Work. <br /> <br />7.6.2.4 If the parties have agreed on a GMP, costs that would cause the GMP, as adjusted <br />in accordance with the Contract Documents, to be exceeded, unless Owner has approved <br />an Adjustment or Change Order. <br /> <br />7.6.2.5 Any bonuses or incentive pay that is the obligation of Design-Builder to pay. <br /> <br />7.6.3 Pass-Through Costs. The following costs shall be “passed through” and paid without <br />mark-up or any added Design-Build Fee: <br /> <br />7.6.3.1 Sales, use, or similar taxes, tariffs, or duties incurred in the performance of the <br />Work. <br /> <br />7.6.3.2 Costs for permits, royalties, licenses, tests, and inspections. <br /> <br />7.6.3.3 Premiums for insurance and bonds required by this Contract or the performance <br />of the Work. <br /> <br />7.7 The Guaranteed Maximum Price. <br /> <br />7.7.1 GMP. Design-Builder guarantees that the Contract Price shall not exceed the Guaranteed <br />Maximum Price (“GMP”) established in the GMP Amendment. Documents used as basis for the <br />GMP shall be identified in the GMP Amendment. Design-Builder agrees that it will be responsible <br />for all costs of completing the Work which exceed the GMP, as it may be adjusted in accordance <br />with the Contract Documents. <br /> <br />7.7.2 Contingency. The GMP shall include a Design-Builder’s contingency, in an amount that <br />is no less than two-point five percent (2.5%) and no more than five percent (5%) of the estimated <br />Cost of the Work, which will be negotiated between the Design-Builder and Owner as a part of the <br />Phase 2 Proposal. The percentage shall depend upon the level of completion of the Design-Build <br />Documents and certainty of subcontractor pricing at that time and depending upon any other risk <br />factors agreed upon between the Design Builder and Owner. <br />