My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
10 <br />Progressive Design Build Contract <br /> <br />7.6 Cost of the Phase 2 Work. <br /> <br />7.6.1 Cost of the Phase 2 Work includes only those items expressly defined in this Section 7.6.1 <br />that are reasonably incurred by Design-Builder in the proper performance of the Phase 2 Work. <br />The Cost of the Phase 2 Work shall not include any Pass-Through Costs (as defined in Section <br />7.6.3), Construction General Conditions Work (as defined in Section 7.4 and Exhibit D), or costs <br />intended to be covered by the Design-Build Fee (as defined in Section 7.5). For the avoidance of <br />doubt, any confusion about the categorization of cost items between the Cost of the Phase 2 Work <br />and Pass-Through Costs shall be resolved in favor of Pass-Through-Costs. Further, any confusion <br />about the categorization of cost items between the Cost of the Phase 2 Work and Construction <br />General Conditions Fee or Design-Build Fee shall be resolved in favor of Construction General <br />Conditions Fee and Design-Build Fee, respectively. <br /> <br />The Cost of the Phase 2 Work shall include only the following: <br /> <br />7.6.1.1 Except for those supervisory and administrative personnel who are covered by the <br />Construction General Conditions Work (Exhibit D), wages of direct employees of Design- <br />Builder performing the Work at the Site or, with Owner’s agreement, at locations off the <br />Site. <br /> <br />7.6.1.2 Except for those supervisory and administrative personnel who are covered by the <br />Construction General Conditions Work (Exhibit D), wages or salaries of Design-Builder’s <br />personnel engaged in the performance of the Work and who are located at the Site or <br />working off-Site to assist in the production or transportation of material and equipment <br />necessary for the Work. <br /> <br />7.6.1.3 Except for those supervisory and administrative personnel who are covered by <br />the Construction General Conditions Work (Exhibit D), wages or salaries of Design- <br />Builder’s personnel stationed at Design-Builder’s Project Office, but only to the extent such <br />personnel perform tasks directly associated with the Project. <br /> <br />7.6.1.4 A multiplier of [to be added in GMP Amendment] percent (___%) shall be applied <br />to the wages and salaries of the employees of Design-Builder covered under Sections <br />7.6.1.1 through 7.6.1.3 hereof to account for employee labor burden, including payroll <br />taxes, pension costs, insurance, and other fringe benefits. <br /> <br />7.6.1.5 Payments properly made by Design-Builder to Subcontractors and Design <br />Consultants for performance of portions of the Work. <br /> <br />7.6.1.6 Costs, including acquisition, transportation, inspection, testing, storage, and <br />handling of materials, furnishings, equipment, and supplies incorporated or reasonably <br />used in completing the Work. <br /> <br />7.6.1.7 Costs of removal of debris and waste from the Site(s). <br /> <br />7.6.1.8 All fuel and utility costs incurred in the performance of the Work. <br /> <br />7.6.1.9 The cost of defending suits or claims for infringement of patent rights arising from <br />the use of a particular design, process, or product required by Owner, paying legal <br />judgments against Design-Builder resulting from such suits or claims, and paying <br />settlements made with Owner’s consent. <br /> <br />7.6.1.10 Deposits which are lost, except to the extent caused by Design-Builder’s <br />negligence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.