My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Noise assessment, air assessment, or visual assessment, or other special studies <br />are not assumed to be required at this time and are not included in this scope or fee. <br /> <br />TASK 4.2 DELIVERABLES <br />• Preliminary NEPA CE Form and technical memos for; Cultural Resources; Hazmat <br />Screening; 4(f) documentation, No Effect Letter for ESA compliance, and 4(d) RRMP <br />documentation provided in Word format provided at or near 60% PSE submittal date <br />for WSDOT submittal by City. <br />• NEPA Checklist in PDF format provided at or near 60% PSE submittal. <br />• Final NEPA CE Form prepared for City of Everett signature and WSDOT submittal <br />provided by Consultant at or after 60% PS&E submittal. <br /> <br />4.3 Prepare JARPA Form for HPA and Facilitate WDFW HPA Submittal and <br />Review: <br />The consultant will prepare a Joint Aquatic Resources Permit Application (JARPA) and <br />vegetation restoration and culvert monitoring plan (e.g., mitigation and monitoring plan), <br />and will provide electronic HPA submittal with the Critical Areas Memo and selected <br />design plans drawings for HPA permit review, assumed to occur at or near the 90% <br />PSE phase. The City will submit the JARPA package to WDFW and the USACE. <br />The project is expected to be self-mitigating in that permanent and temporary adverse <br />impacts to wetlands, streams, and buffers can be offset onsite through riparian <br />vegetation and stream habitat restoration. <br /> <br />TASK 4.3 ASSUMPTIONS <br />• A NEPA Determination will be noticed/processed/obtained by the City prior to the <br />HPA JARPA submittal. <br />• JARPA submittal with proposed project drawings and quantities based on 60% <br />design; prepared by the City with support from Otak under other tasks is assumed to <br />be necessary due to work over Pigeon Creek 2 for the culvert replacement and in <br />water work in the creek is assumed to occur. , the support is limited to the hours <br />identified in the cost computation; if additional hours are needed, Otak will request a <br />release of some management reserve budget or a contract amendment <br />• A site recon meeting with WDFW is assumed and no additional meetings are <br />assumed for HPA review. Periodic email check-ins with the City and WDFW will be <br />provided by email or virtual means by the CONSULTANT for approximately 4 weeks <br />after the JARPA submittal to facilitate HPA review, assuming no more than a few <br />hours per week of maximum City coordination assistance during this time. <br />TASK 4.3 DELIVERABLES <br />• Consultant correspondence via phone/TEAMS and/or email.\ <br />• JARPA Form and Drawing Set <br />• Mitigation Plan, including vegetation restoration and culvert monitoring plan for <br />regulatory compliance. <br />• Agency site meeting
The URL can be used to link to this page
Your browser does not support the video tag.