My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />• Draft and final documents will be provided to the City by email, to ease the electronic <br />HPA submittal package to the WDFW by email (by the City). This will include the <br />Wetland and Stream Delineation and Wildlife Habitat Assessment Report (prepared <br />under Task 4.1), JARPA form and figures per USACE standards, (as described <br />herein), mitigation and monitoring plan, and selected design drawings and available <br />information to illustrate and describe the project for HPA review. <br />4.4 NPDES Construction Stormwater General Permit (CSGP) <br />It is unknown if construction of the PROJECT may require an acre or more of <br />cumulative land disturbance triggering CSGP Notice of Intent (NOI) submittal. However, <br />submitting permit coverage is advised since work will occur over and in Pigeon Creek 2 <br />and permit coverage could be required by ecology due to potential water quality risks to <br />the stream. If no permit is obtained prior to construction, Ecology could require <br />coverage during construction and cause construction delays. <br /> <br />TASK 4.4 ASSUMPTIONS <br />• The City will be provided with application forms after submittal and will need to sign <br />and return forms to Ecology and publish the required public notices. <br />• Permit coverage will be transferred to the Operator (Contractor) after bid award and <br />before construction. All permit fees will be paid by the permittee and transfer of <br />coverage will be included in the project manual. <br />• The Stormwater Pollution Protection Plan (SWPPP) will be provided by the <br />Contractor in specifications and permit compliance will be addressed by Contractor. <br /> <br />TASK 4.4 DELIVERABLES: <br />• Draft specification for Contractor compliance and permittee responsibility. <br /> <br />5. Hydraulic Modeling and Alternatives Analysis <br />This task will inform you of the layout and/or alignment of the selected option. Identify and select a design <br />solution for Pigeon Creek 2 that will minimize temporary and permanent creek and wetland impacts for <br />replacing the existing barrier culvert with a 100% fish passible conveyance of the creek under Olympic <br />Blvd while minimizing sensitive area impacts. Options/elements to include Box Culver t, Arch Culvert, <br />Precast Bridge and daylighting portions of Pigeon Creek 2 for all types of structures. <br />5.1 Hydraulic Modeling <br />Otak will perform hydraulic modeling for stream and structure design to support Everett’s preliminary <br />design. Refinement of the model to support final design will be completed under a contract amendment. <br />The goal of hydraulic modeling is to ensure that the design allows for safe fish passage. Select flows <br />such as a fish passage design flow, summer low flow, 2-year flow, and 100-year flow will be modeled and <br />extracted results will be used to support preliminary design. <br />TASK 5.1 ASSUMPTIONS <br />Consultant to provide modeling and modeling documentation of the options and should include:
The URL can be used to link to this page
Your browser does not support the video tag.