My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />included in the Geotechnical Memorandum. Geotechnical reports will be included as an attachment in <br />Task 8.6. <br />TASK 6.1 DELIVERABLES <br />• Review comments on draft geotechnical reports <br /> <br />TASK 6.1 ASSUMPTIONS <br />• The geotechnical report will be utilized by Otak to guide the conceptual design of the culvert <br />foundation, possible retaining walls, and Pigeon Creek streambed <br /> <br />7. Intentionally left blank. <br /> <br />8. Agency Meetings and Permit Facilitation <br />Prior to permit submittals, Consultant will arrange a meeting, preferably on-site, with <br />applicable City, State, Tribes, and Federal resource and regulatory agency staff to <br />assure that they have a solid understanding of the existing and proposed conditions for <br />the project prior to receiving the JARPA package. After permits are submitted, the <br />Consultant will coordinate with City staff to respond to comments, provide additional <br />clarification, and assist with shepherding the permits through the process efficiently. <br /> <br />TASK 8.1 DELIVERABLES: <br />• Meeting agenda and minutes (draft and final) for all consultations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.