DUCT CONSTRUCTION STANDARDS DUCT CONSTRUCTION STANDARDS `Ill� STANDARD INSERT METHODS 0
<br /> NEW AND EXISTING CONDITIO Hermanson
<br /> Building Today,Defining Tomorrow
<br /> PLUMBING AND PIPING HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED Hermanson Company LLP
<br /> •BANGER INSERT ♦MINI-UNDERCUT INSERT •BANGER INSERT ♦WEDGE ANCHOR BOLT 1221 2nd Avenue North
<br /> HANGER MATRIX BY PIPE MATERIAL CABLE WITH 90'EYELET END •CABLE WITH 90'EYELET END THREADED ROD ♦NUT AND ROD COUPLING Kent,Washington 9t 032
<br /> •BOLT AND WASHER •BOLT AND WASHER ♦THREADED ROD Tel:(206)575-9700
<br /> Pipe Material;Steel Pipe �� Conditions;Mild Temperature Systems Fax:(206)575-9800
<br /> www.hermanson.com
<br /> Schedule 40/80/Standard:Threaded,Buttwelded,Socket Welded,Grooved Contractor Reg g:HERMACLO05BJ
<br /> al/2-2 a•w. ,/a 111
<br /> a V2•4- ae•D 1/2IS GC
<br /> S. St. lo D.C. E Y t,
<br /> 3/4
<br /> A
<br /> Pipe Material:Steel Pipe Conditiors:High Temperature Systeans LITHIUM
<br /> Schedule 40/80/Standard:Threaded,Buttwelded,Socket Welded,Gronved LAB
<br /> HARDWARE REQUIRED 711ARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED
<br /> al/x•-:• a..H 3/a •CABLE WITH REBAR OR E ANCHOR BOLT ♦DEWALT 109 INSERT •WEDGE ANCHOR BOLTaWI: U2 E END E WITH 90•EYELET END •ROD COUPLING AND NUT •NUT AND ROD COUPLINGs/4 ND WASHER •THREADED ROD •THREADED ROD ZAP ENERGY
<br /> 5901 23RD DR. W.
<br /> 12•-11" ollerClevls ]/1 10 Ftt1 O.C.
<br /> 1e•-sa• R,E.,«,,,, , HFeN aE EVERETT, WA 98203
<br /> Pipe Material:Cast Iron Conditions:All Systems
<br /> Na-Hub
<br /> �J J
<br /> 3/a 0.c.pi-Irom caaFOnsl
<br /> Dew 1/2 a.c lss•R•m caugln2D1
<br /> s/e D.c D2"..—PI-)
<br /> OR
<br /> 314 o.c ur A•m ceuwmDl 0
<br /> 4 WD HjN�,s'
<br /> 11"- ]/a 0.c.p2^Dam cauFlma+l
<br /> Cwgln 1
<br /> HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED HARDWARE REQUIRED
<br /> Pipe Material:ABS/PVC/CPVC Conditions:All Systems •BEAM CLAMP ♦CABLE WITH LOOP END •BEAM CLAMP •BEAM CLAMP
<br /> Solvent Weld,Threaded •CABLE WITH 90'EYELET END •THREADED ROD •THREADED ROD 36I49
<br /> •BOLT AND WASHER •NUT •NUT �O� fS1E1>�9
<br /> 2.Ux•-2^ awl...mo,. It. ONALE
<br /> o. a.H• Vt.
<br /> 4— — �' October 22,201
<br /> s/,
<br /> Pipe Material:Copper Conditions:All Systems
<br /> Pressed,Soldered,Grooved
<br /> I.'
<br /> Pipe-a„ Wnga�•o.T,pe Rod Diarnete,
<br /> ,rMSpacing ISSUE FOR PERMIT
<br /> 212-1A• awuerlA.P 319 Lr—c
<br /> Oc
<br /> Ckvi• LA ioh ac
<br /> .--6• OeNi V. 10 F"t O.C.
<br /> " a.w SA C. I � Key Plan
<br /> 30• aHa 3/4 lOFM O.G
<br /> P-H-MAT
<br /> TABLE305.4 DUCTWORK HANGER REQUIREMENTS
<br /> PIPING SUPPORT SPACING' B • • STANDARDS
<br /> MAXIMUM MAXIMUM IL ROUND, OVAL AND RECTANGULAR
<br /> PIPING MATERIAL HORIZONTAL VERTICAL
<br /> SPACING(feet) SPACING(feet)
<br /> ABS pipe 4 101
<br /> Aluminum pipe and tubing 10 I
<br /> RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT RECTANGULAR DUCT
<br /> Cast-iron pipe I i W.D s]D"A WI cD-I w•o s,aD"A WI ED") W.D•9E'x WIDTHS]e"1 (WDS 120• RRWH S98.1 IW.O<,92"B WIDTH<_96.1 IWDS t92"e WIDTH 1120") (W.0<t92•A WIDTHSIA4•)
<br /> Copper or copper-alloy pipe Ill SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED
<br /> .N2 CABLE:BAUD(FLAT) •NO3 CABLE:STUD •3I8 GALV THREADED Roo .LS GALV THREADED ROD .V2 GALV THREADED ROD •1.GALV THRGDID NOD .112 wLV THREADED Roo
<br /> •NO2 CABLEI BARREL(PAN) ♦MO3 CABLE BARREL.L(PAN)
<br /> Copper or copper-alloy tubing 10 BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED
<br /> •GRIPPLE TRAPEZE BRACKET ♦ORIPPLE TRAPEZE BRAOK!! •P,000F 11—UNIJTRUT •HOD,.,-5M DOUBLE BRUT •MOp,I 1.0M DOUBLE BRUT •3A3a11a REEL ANGLE ----L ANGLE
<br /> CPVC pipe or tubing,1 inch 3 I(1°
<br /> and smaller
<br /> CPVC pipe or tubing,1'/,inches 4 10`
<br /> and larger Revisions
<br /> Lead pipe Continuous 4
<br /> PB pipe or tubing 22/3(32 inches) 4 — --------- --
<br /> PE-RT 1 inch and smaller 2%(32 inches) 10` ® - —
<br /> PE-RT 1'/4 inches and larger 4 10` OVAL DUCT OVAL DUCT OVAL DUCT OVAL DUCT OVAL DUCT OVAL DUCT OVAL DUCT
<br /> PEXtubinglinchandsmaller 22/3(32inches) 10`' I_5Te"SWIDTR56o•) ww<,Do-swmTR<BaT w.D<98•'SwI B") (W.D<,z0-Bw1orH598.1 W.O5,92BWIDTN<_96 W05,9zBVADTNS,zo W.D5,9iBW0TNS,4dry —
<br /> I ,I SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS
<br /> REQUIRE D SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED
<br /> PEX tubing 1/4 inches and larger4 I O` NO2 CABLE:STUD(FLAT) •NO3 CABLE:STUD(FLAT) 3 B GALV THREADED ROD YB GALV THREADED ROD 112 GALV THREADED ROD 1.W.LV THREADED ROD 1.
<br /> GALV THREADED ROD
<br /> BARREL(PAR) RELIPAN) —
<br /> Polypropylene(PP)pipe or 2 BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED
<br /> tubing,1 inch and smaller 2/3(32 inches) 10` •P100o:,-5-e-UNI-BRUT .n000:,-Ba-Uxlsrqur •P,oaa ldlD-UNIaTRR •P,00,.,-BAS-11.BRUT •Hoot:1-52e BOB—STRUT •3.BA114 R![L AMBL[ •gHA1N 8TElL ANGLE —
<br /> Polypropylene(PP)pipe or — —
<br /> tubing,1'/,inches and larger 10
<br /> PVC pipe 1 10`
<br /> Steel tubing 8 10
<br /> Steel pipe 12 15 — —
<br /> For SI:1 inch=25.4 mm,I foot=304.8 mm.
<br /> a.See Section 301.18. 10/25/24 BDG ISSUE FOR PERMIT
<br /> b.The maximum horizontal spacing of cast-iron pipe hangers shall be No. Date By Description
<br /> increased to10 feet where l0-foot lengths ofpipeaminstalled. HANGER SPACING GUIDE
<br /> c.Mid-story¢vide. INSTALL HANGERS SHOWN ON... ROUND DUCT ROUND DUCT ROUND DUCT ROUND DUCT ROUND DUCT
<br /> ROUND @ 1 EVERY 10 FEET oIANETERs 18a-) DIAMETER< O) mAMRlRs3er) OIAMerew 584a OWIRE115-In.ALL 8[IBMIE
<br /> OVAL @ 1 EVERY 08 FEET SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED SUPPORTS REQUIRED DeSlgn Team
<br /> R E CT 0 1 EVERY 08 FEET not EAGER,BTUD(FLAT)1O R ARLS.Rost E BTuO(PLAT)-15 FT •3m GALV THREADED ROD ♦101 GALV THNEADlD ROD •3n GALV THREADED ROD
<br /> •NO2 CABLE 621RREL PAN 10 FT •NO2 CABLE BARREL PAN 15 FT Design BDG
<br /> BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED BEARER REQUIRED
<br /> •MNOL!CABLE LOOP •BINGL!CABLE LOOP •12 BA BAMD LO01 OR PEAR •12 OA DOTTOM BADDL!ONLY •12 GA TOP AND BOTTOM SADDLE Drawn FVP
<br /> Checked DTN
<br /> � 1
<br /> Pre—Construction Number 21-24-27429
<br /> Construction Number
<br /> Issue Date 10/25/24
<br /> CONSTRUCTION
<br /> STANDARDS
<br /> - HVAC
<br /> FOR CITY USE:
<br /> M0 .03
<br /> L City of Everett Permit Services
<br /> EVERETT Reviewed for Permit 12/19/2024
<br />
|