My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CDW-Government LLC 6/9/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
CDW-Government LLC 6/9/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 11:02:47 AM
Creation date
6/12/2025 11:01:50 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
CDW-Government LLC
Approval Date
6/9/2025
Council Approval Date
6/4/2025
End Date
3/31/2026
Department
Finance
Department Project Manager
Jenny Chang
Subject / Project Title
Municipal Court Security Camera Upgrades
Tracking Number
0004850
Total Compensation
$322,521.16
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 2 SLED-27347 | CDW Government LLC SOW 123351 <br />i.Rack is assumed existing <br />b.Power Backup & Distribution: Customer Furnished <br />i.(1) Horizontally mounted PDU(s) per rack/cabinet. <br />ii.(1) Rack-mounted UPS per rack/cabinet. <br />c.Bonding: <br />i.Is not included in this scope <br />d.Connectivity: <br />i.Copper patch panels: <br />1.48-Port, Modular patch panels for horizontal cable terminations <br />2.Copper patch cords will be furnished by Installer and installed by Installer. <br />2.Pathways & Penetrations – Installer will furnish and install: <br />a.J-Hooks: <br />i.As required where cable tray and conduit are not present <br />ii.J-hooks will be secured directly to the building steel via beam clamp <br />or hammer on flange <br />iii.J-hooks will be suitable for plenum spaces <br />b.Conduit & Penetrations: <br />i.Conduit will be EMT <br />ii.Conduit will not be painted <br />iii.Penetrations will be installed using conduit with fire putty <br />iv.Conduit and penetrations are in size and quantity as to maintain the <br />appropriate fill ratio. <br />3.Video Surveillance Solution (VSS) – Installer will furnish and install: <br />a.Headend, located in the MDF/IDFs (Client/Owner Furnished & Installer Installed): <br />i.(1) 2RU Server <br />ii.(1) 2RU UPS <br />iii.(1) 1RU Switch <br />b.Interior Cameras (Client/Owner Furnished & Installer Installed): <br />i.(22) CAMERAS <br />c.Exterior Cameras (Client/Owner Furnished & Installer Installed): <br />i.(13) CAMERAS <br />1.(13) Outdoor pendant kits <br />d.Cabling: <br />i.(35) Cat6, UTP cable(s) <br />ii.Tested via cable qualifier <br />iii.Drops will be housed using Surface Mount Boxes (SMB) as <br />applicable for each drop location. <br />iv.10-Feet of slack will be coiled at the Work Area Outlet (WAO) and <br />3-Feet at the ER/TR/TE. <br />v.Patch cords for the WAO will by furnished by Installer and installed <br />by Installer. <br />vi.Elevator Camera is assumed to be analog, able to handle new camera <br />and can be installed with Balun and connectors provided by Customer <br />e.Engineering & Installation - Installer Engineer(s) will not configure the equipment listed above: <br />i.Installer Technicians will coordinate remotely with Customer <br />personnel to commission and validate the operation of the installed system and its peripheral <br />components <br />Items/Services Provided
The URL can be used to link to this page
Your browser does not support the video tag.