My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Skagit County 5/29/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Port of Skagit County 5/29/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 11:22:06 AM
Creation date
6/12/2025 11:16:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Skagit County
Approval Date
5/29/2025
End Date
6/7/2025
Department
Police
Department Project Manager
Jonathan Karr via Alicia Gill
Subject / Project Title
Hold Harmless for Training Facility/Exercise
Tracking Number
0004853
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Waivers/Releases
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Hazardous Materials Survey Report RMC Architects Port of Skagit SWIFT Center – Douglas Building Sedro-Woolley, Washington <br />4 October 30, 2023 PBS Project 41140.017 <br />•4” brown cove base and associated dark brown mastic – Patient Wings, Offices, Dining Rooms, <br />Treatment Rooms throughout <br />•6” gray cove base and brown mastic - Patient Wings, Offices, Dining Rooms, Treatment Rooms <br />throughout <br />•6” gray cove base and tan mastic - Patient Wings, Offices, Dining Rooms, Treatment Rooms <br />throughout <br />•Black threshold material – Restrooms throughout <br />•Brown/Yellow/Cream mastic associated with fiberglass reinforced plastic panels – in Corridors, ShowerRooms and Change Rooms throughout <br />•Yellow mastic behind corkboard strips – Rooms in East and West wing <br />•Yellow mastic on back of wardrobe – Rooms in East wing <br />•Gray sink undercoat – Room 310 <br />•Joint compound and gypsum wallboard – 2nd floor Corridor <br />•White skim coat on plaster ceiling and walls – throughout <br />•12” acoustical ceiling tile and tan mastic – throughout <br />•12” acoustical ceiling tile and white mastic – Sleeping Room 409 (NE-18) <br />•12” acoustical ceiling tile and brown mastic – throughout <br />•Concrete masonry unit mortar – on walls in Mechanical Rooms , basement and stairwells <br />•Red firestop – throughout <br />•Gray duct sealant – throughout <br />•Yellow mastic on metal duct – throughout crawlspace <br />•Fiberglass wrap on column seam – Storage Room 18 <br />•Fiberglass wrap with black mastic – throughout crawlspace and pipe chases <br />•Black expansion joint in concrete masonry unit wall – Basement <br />•White sealant at pipe penetration in floor – Southeast Utility Room <br />•White sealant between sink and counter – East Wing Laundry Rooms <br />•White caulk on gypsum wallboard panel – Southeast Home Room (334) ceiling hatch <br />•White caulk between acoustic ceiling tile and wall – Patient Room 316 (SE-11) <br />•White window frame caulk – throughout <br />•Interior gray and white door frame caulk – throughout <br />•Sealant between wall and column – Southeast Wing, north elevation <br />•Mortar between terracotta blocks – South driveway at main entrance <br />•Plaster on concrete (exterior) – Southeast Wing, south elevation <br />•Texture on exterior concrete walls – West Wing
The URL can be used to link to this page
Your browser does not support the video tag.