My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Skagit County 5/29/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Port of Skagit County 5/29/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 11:22:06 AM
Creation date
6/12/2025 11:16:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Skagit County
Approval Date
5/29/2025
End Date
6/7/2025
Department
Police
Department Project Manager
Jonathan Karr via Alicia Gill
Subject / Project Title
Hold Harmless for Training Facility/Exercise
Tracking Number
0004853
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Waivers/Releases
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Hazardous Materials Survey Report RMC Architects Port of Skagit SWIFT Center – Douglas Building Sedro-Woolley, Washington <br /> <br /> 3 October 30, 2023 PBS Project 41140.017 <br />• Soft, gray interior window putty – throughout all elevation – approximately 14,845 LF; <br />• Cement asbestos board (CAB) - exterior wall panels at all elevations of building – approximately <br />5,576 SF; <br />• Caulking/sealant – exterior CAB panels – approximately 8,925 LF. <br />The following materials sampled and found not to contain detectable concentrations of asbestos as part of this investigation. <br />• Green carpet mastic – Room 224 <br />• Yellow carpet mastic – throughout <br />• Gray leveling compound – throughout <br />• Gray window putty – ground floor Clerks Office at interior of window <br />• White counter laminate and yellow/clear mastic – Medicine Rooms, Dining Rooms, Nurses Station and <br />Medication Rooms throughout <br />• 9” blue vinyl floor tile and associated yellow mastic – Room 306 <br />• 9” green and white streaked vinyl floor tile and mastic – Rooms 933 and 934 <br />• 12” gray with white specks vinyl floor tile and associated yellow mastic – throughout <br />• 12” white vinyl floor tile and associated yellow mastic – East and West Wing Custodial Cosets and <br />Seclusion Room (NW-10) <br />• Blue pebble pattern sheet vinyl flooring with associated cream and yellow mastics – East and West <br />wing kitchens <br />• Gray sheet vinyl flooring and associated cream mastic – 1st floor East Wing Nurses’ Station <br />• Gray /light blue/tan pebble pattern sheet vinyl with fuzzy backing and yellow mastic – in Laundry <br />Rooms, Exam Rooms, and Bathrooms throughout <br />• Speckled sheet vinyl flooring and associated beige mastic – Hallway at Room 328 <br />• Beige sheet vinyl flooring and associated yellow mastic – throughout <br />• Tan sheet vinyl flooring and associated yellow or tan mastic – throughout <br />• Brown sheet vinyl flooring and associated yellow mastic – throughout <br />• Brown cementitious material – 3rd floor, under current flooring <br />• Grout associated with quarry tile – Solarium (Room 909) <br />• Tan quarry tile and mortar – Solarium (Room 909) <br />• Grout associated with 1” ceramic floor tiles – Restrooms, Shower Rooms and Change Rooms, <br />throughout <br />• Mortar associated with 1” ceramic floor tiles – Restrooms, Shower Rooms, Change Rooms, throughout <br />• Grout associated with 4” ceramic wall tiles – Restrooms, Shower Rooms, Change Rooms, throughout. <br />• Mortar associated with 4” ceramic wall tiles – Restrooms, Shower Rooms, Change Rooms, throughout. <br />• Yellow mastic associated with 4” ceramic wall tiles – Restrooms, Shower Rooms, Change Rooms, <br />throughout
The URL can be used to link to this page
Your browser does not support the video tag.